My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/13/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 08/13/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:10:20 AM
Creation date
9/3/2003 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/13/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I*C HAM G E <br /> ORDER <br /> <br />AIA DOCUMENT G701 <br /> <br />OWNER ___ <br />ARCHITECT ___ <br />CONTRACTOR <br />FIELD <br />OTHER <br /> <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOUP~GED WITH RESPECT TO ITS COMPLETION <br /> <br />OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D40 I. <br /> <br />PROJECT: Renovation of the existing CHANGE ORDER NO.: ONE (I) <br /> <br /> I <br /> I <br /> i <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />(Name, address) <br /> <br />TO CONTRACTOR: <br />(Name, address) <br /> <br />Ramsey City Hall <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br /> <br />Braun Built Corporation <br />P.O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />DATE: <br /> <br />ARCHITECT'S PROJECT #: <br /> <br />CONTRACT DATE: <br /> <br />CONTRACT FOR: <br /> <br />August 6, 2002 <br /> <br />1272.03 <br /> <br />JUNE 19, 2002 <br /> <br />Remodeling <br /> <br />The contract is changed as follows: <br />I.) Remove Drywall ceiling and repair sheetrock after water leak is corrected <br />2.) Add aluminum trim to the existing office windows to conceal gap at top <br />3.) Provide 20XI6 return air path at south end on new wall in room 120 <br />4.) Delete new electrical panel LP-I and associated feeder <br />5.) Provide three way switching in room 102 <br /> <br />240.00 <br />720.00 <br />288.00 <br />(S00.00) <br />420.00 <br /> <br />Total this change order <br /> <br />$ 1,168.00 <br /> <br />The original Contract Sum was <br />Net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be increased by this change order in the amount of <br />The new Contract Sum including this Change Order will be <br /> <br />$ 96,580.00 <br />$ o.oo <br />$ 96,580.00 <br />$ 1,168.00 <br />$ 97,748.00 <br /> <br />The Contract time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is (date) <br /> <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been <br />authorized by Construction Chan~e Directive. <br />Authorized: <br /> <br />ARCHITECT CONTRACTOR OWNER <br /> <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />222 N. 2nd Street_ <br />Minneapolis, MN 55401 <br /> <br />Braun Built Corporation <br />Address <br />P.O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />City of Ramsey <br />Address <br />Ramsey City Hall <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br />BY <br /> <br />DATE DATE <br /> <br />I AIA DOCUMENT GT01 * CHANGE ORDER * 1987 EDITION * AIA - COPYRIGHT 1987 * <br /> <br />THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006-5292 <br />WARNING; unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was elecrzonically produced with permission of the AIA and <br />cannot be reproduced without violation until the date of expiration noted below. <br /> <br />-309- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.