Laserfiche WebLink
PDF Complete <br />Click Here to up <br />Unlimited Pag <br />Your complimentary <br />use period has ended. <br />Thank you for using <br />PDF Comp /ete. <br />PAY ESTIMATE NO. 2 <br />Date: October 26, 2010 <br />Project: 2010 Pavement Maintenance Program — Division A <br />Contractor: Allied Blacktop Inc. <br />Contract Amount: 5271,143.41 (includes CO #1) <br />Award Date: July 14, 2010 <br />To <br />No Item Bid Unit Unit price Date Extension <br />1 Mobilization 1 Is $ 5,000.00 1 $ 5,000.00 <br />2 Traffic Control 1 Is $ 5,000.00 1 $ 5,000.00 <br />3 Bituminous Crack Sealing Material 25,911 Ibs $ 1.40 23,030 $ 32,242.00 <br />4 Seal concrete joint 12,000 ft $ 2.25 18,896 $ 42,516.00 <br />5 CRS -2 Bit Material 42,066 gals $ 2.40 40,650 $ 97,560.00 <br />6 CRS -2p Bit Material 10,828 gals $ 2.80 10,445 $ 29,246.00 <br />7 FA 2 Granite Aggregate 172,263 sq yds $ 0.30 172,263 $ 51,678.90 <br />8 FA 2 1/2 Granite Aggregate 22,337 sq yds $ 0.30 22,337 $ 6,701.10 <br />9 Dashed Yellow Epoxy Stripping 50 Ift $ 0.40 140 $ 56.00 <br />10 Double Yellow Epoxy Stripping 2,220 Ift $ 0.75 3,086 $ 2,314.50 <br />11 Dashed White Epoxy Stripping 365 Ift $ 0.55 640 $ 352.00 <br />12 Solid White Epoxy Stripping 6,488 Ift $ 0.22 6,237 $ 1,372.14 <br />13 Epoxy Zebra Crosswalks 234 sq ft $ 4.65 432 $ 2,008.80 <br />14 White Epoxy Stp Bars 3 ea $ 210.00 4 $ 840.00 <br />15 White epoxy turn arrow (R or L) 20 ea $ 140.00 12 $ 1,680.00 <br />16 White epoxy turn / thru arrow (R or L) 2 ea $ 190.00 13 $ 2,470.00 <br />FC 24" Solid Line Yellow Epoxy ft $ 5.00 75 $ 375.00 <br />