Laserfiche WebLink
City of Ramsey 2030 Comprehensive Plan <br />Chapter 6: Transportation <br />Figure 6 -2 Planned Transportation System <br />City of Ramsey <br />2030 Comprehensive Plan <br />Planned Transportation <br />System <br />0.6 0 0.6 Miles <br />1.200 2030 ADT with Future River Crossing <br />1.200 2030 ADT without Future River Crossing <br />— Existing Principal Arterial <br />— Existing A Minor Reliever <br />— Existing A Minor Expander <br />— Existing A Minor Connector <br />— Existing B Minor Arterial <br />Existing Major Collector <br />-- - - Existing Minor Collector <br />— Existing Local Roads <br />Existing Trails <br />July 14, 2009 <br />Bonestroo <br />Ii3&43B ODVGISJm dJ—tram cOVId <br />City of Ramsey 2030 Comprehensive Plan Pg. 6 -9 <br />Future Minor Collector <br />a a S <br />Potential Bridge Corridor <br />- - - <br />Proposed Trails <br />® <br />Planned Interchange <br />O Proposed <br />Interchange <br />Proposed Commuter <br />Rail station <br />Proposed Overpass <br />Park <br />- <br />Northstar Commuter Rail <br />Water <br />July 14, 2009 <br />Bonestroo <br />Ii3&43B ODVGISJm dJ—tram cOVId <br />City of Ramsey 2030 Comprehensive Plan Pg. 6 -9 <br />