My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 07/23/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:35 AM
Creation date
9/3/2003 1:48:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br /> <br />12. <br /> <br />13. <br /> <br />e) Street sweeping <br />f) Seal coating <br />g) Adjusting water shut-offboxes <br />h) Maintenance of storm water and facilities <br />i) Boulevard seeding <br /> <br />("Stage II Improvements") <br /> <br />Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br />Improvements. The DEVELOPER shall also deposit an amount that is determined by the <br />CITY to be adequate to aid in the operation and maintenance of street lights in locations <br />within the Plat determined by the City Engineer and installed by Connexus for the first three <br />(3) years after final plat approval. The CITY will bill residents in the Plat at least quarterly <br />for street light maintenance and operation costs; billing will be initiated at the time a residence <br />connects to municipal water and sanitary sewer. The DEVELOPER will pay to the cITY an <br />amount equal to 100% of the City Engineer's estimated construction cost of the items prior to <br />recording of the final Plat. The City Engineer's estimated cost of construction is: <br /> <br />a) Street striping and signing (6~ $200) <br />b) Traffic signing (2~$200) <br />c) Future Through Street Sign (1 ~ $200) <br />d) Street lights (6~$1700) <br />e) Street sweeping <br />f) Sealcoating <br />g) Street light maintenance (6 ~ $270) <br />h) Adjusting water shut-offboxes <br />i) Maintenance of storm water and facilities <br />j) Boulevard seeding <br /> TOTAL <br /> <br />$1200.00 <br />$400.00 <br />$200.00 <br />$10,200.00 <br />$300.00 <br />$3375.00 <br />$1,620.00 <br />No charge <br />No charge <br />No charge <br />$17,295.00 <br /> <br />Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building permit <br />applicant or the homeowner at the time the Certificate of Occupancy is issued or as soon <br />thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost, therefore against <br />the lot. The DEVELOPER hereby waives all right to a public hearing and other statutory <br />rights or City Charter rights granted a property owner relating to special assessments, <br />including the right to appeal the special assessment for installation of the hard surfaced <br />driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br />the Plat in order to install the improvement described in this paragraph if the same has not <br />been previously constructed. <br /> <br />Evergreen Point Subdivision <br />Development Agreement <br />Page 5 of 12 <br /> <br />-103- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.