My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 8. <br />A. <br />B. <br />C. <br />D. The City shall notify the Contractor by 12:00 noon on the work day following the <br />scheduled pick -up of all missed stops. The Contractor is required to service such <br />locations before 5:00 p.m. on the date of notification. <br />E. The Contractor's employees shall handle all Containers with reasonable care to <br />avoid damage, shall replace all Containers in an upright position and shall <br />immediately clean up and dispose of any Recyclable Materials which may have <br />fallen out of a Container. <br />F. The performance of the Contract shall be done by the Contractor with forces <br />which are adequate to insure the satisfactory collection and disposal of the <br />Recyclable Materials at all tines. Contractor's failure to perform shall not be <br />excused by adverse conditions of weather, breakdown and similar hindrances <br />which on other work might be regarded as "acts of providence ". <br />G. The Contractor shall certify that the materials collected in the recycling project <br />are delivered to a recycling processing center. Materials found to be landfilled <br />will be in violation of City ordinance and will cause the Contractor to incur the <br />penalties listed in the City's recycling ordinance. <br />COMPENSATION <br />The City will compensate the Contractor for the collection of Recyclable <br />Materials from City residents at a rate of $2.95 per month per Residential <br />Property for calendar years 2011 and 2012 <br />attached hereto and made a part hereof. <br />The number of Residential Properties will he updated not less than every calendar • <br />quarter and will be equal to the number of Residential Properties billed for <br />participation m the Recycling Program through the City's utility billing system. <br />The rate per Residential Property is fixed and camiot be changed without mutual <br />agreement of both parties, <br />SECTION 9. FILING OF REPORTS <br />The Contractor shall submit a monthly summary describing the residents' participation rate, the <br />quantity and kinds of all Recyclable Materials collected and the primary purchaser(s) of the <br />Recyclable Materials. Monthly summaries shall be submitted no later than the 15 day of the <br />month following the month for which the report is submitted. <br />SECTION 10. ACCESS TO RECORDS <br />The Contractor shall permit the City to review its books, documents, papers and records which <br />are directly related to the performance of this Contract for the purpose of making an audit, and <br />other examinations deemed necessary by the City. <br />Fomiatted: Indent: Left: 0.5 ", Hanging: 0.5 ", <br />Numbered + Level: 1 + Numbering Style: A, B, <br />C, ... + Start at: 1 + Alignment: Left + Aligned <br />at: 0.25" + Indent at: 0.5" <br />Fomiatted: Indent: Left: 0.5 ", Hanging: 0.5" <br />Fomiatted: Left, Indent: Left: 0.5 ", Hanging: <br />0.5 ", Numbered + Level: 1 + Numbering Style: <br />A, B, C, ... + Start at: 1 + Alignment: Left + <br />Aligned at: 0.25" + Indent at: 0.5" <br />Fomiatted: Do not check spelling or grammar <br />
The URL can be used to link to this page
Your browser does not support the video tag.