Laserfiche WebLink
Legacy Christian Academy <br />Final Plat and Site Plan Review <br />December 8, 2010 <br />Page 6 of 7 <br />Future phase development of Outlot B and the southerly 2 lanes of Bunker Lake Boulevard, <br />when constructed, must make accommodations for a future raw water line that would serve <br />the City surface water treatment plant; this will be evaluated when such improvements are <br />triggered by future development. <br />Park & Trail Fees: The 2010 rate for Park Dedication and Trail Fees are $4,738 /acre and <br />$1,090 /acre respectively for commercial properties. Because City staff and the applicant continue to <br />dialogue about the exact configuration of lot lines and sizes, this fee will be determined at the time of <br />final plat. At the City Council Meeting October 26, 2010, the Council accepted the recommendation <br />of the Park Commission of a 4.175 acre Outlot. This fulfills $395,623 in Park Dedication (Value <br />afforded to LCA = $94,760 per acre). Trail fee is estimated to be $70,043. We understand you are <br />requesting a waiver of the City's trail development fee in lieu of construction of trails along the <br />extension of Bunker Lake Boulevard and the west side of Puma Street. City Code only allows for <br />credit for portions of trails constructed off -site, which equate to a credit of approximately $12,000. <br />Any deviation from this credit standard shall require City Council approval. <br />Sanitary Sewer, Water, Stormwater Trunk Fees. The 2010 rate for Sewer, Water, and Stonn- <br />water Trunk Fees are $3,824 /acre, $8,337 /acre, and $4,465 /acre respectively for commercial <br />properties. Because City staff and the applicant continue to dialogue about the exact configuration of <br />lot lines and sizes, this fee will be determined at the time of recording of final plat. Based on the <br />reduced rate for net area instead of gross area it would equal $245,730 for Sewer, $535,736 for Water <br />and $250,040 for Stormwater. The final amount collected will be dependent upon credits available <br />based on the final construction costs determined through the assessment project request. <br />Lighting: City standards require that the luminaire (light source) must not be visible from beyond the <br />property line. Any lighting proposed to illuminate off - street parking areas, signs, or <br />facilities /structures shall be arranged to deflect light away from Bunker Lake Blvd and adjacent <br />properties. No lighting is proposed along the westerly extension of Bunker Lake Boulevard at this <br />tune, but should Council choose boulevard lighting could be included in the final design drawings for <br />that project. If added, such lighting would comply with the City's priority streetlighting policy. An <br />internal site lighting plan must be submitted for review, including the parking areas and any proposed <br />athletic field lighting. The site lighting plan should include lights placed at each entrance to <br />adequately light the access points for safe maneuverability. <br />REU Number: This property will be subject to a storm water utility charge based upon the amount of <br />impervious surface on the site. The quarterly charge is dependent upon the number of Residential <br />Equivalent Units (REU) calculated for this property. Please provide the overall property size, and <br />impervious area calculations to assist in determining this fee. <br />If you have any questions, please call our office at (763) 427 -1410 <br />The City Council will be meeting at 7:00 p.m. on Tuesday, December 14, 2010 to review your final plat <br />and site plan. You, or your representative, are strongly encouraged to attend the meeting in order to <br />answer any questions that may arise. If you have any questions or need additional information, please <br />don't hesitate to call us. <br />