My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 06/11/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:05 AM
Creation date
9/3/2003 2:30:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br /> <br />Brian Olson - Alpine Drive Letter rev..doc <br /> <br />May 8,2002 <br /> <br />Installation of Utilities and Bike Path <br />Alpine Drive <br /> <br />Dear resident: <br /> <br />The City of Ramsey has requested Arcon Development to notify property owners adjacent <br />to Alpine Drive ( 153rd Ave.) of construction that is going to take place on Alpine Drive <br />beginning in approximately a month. This construction involves the installation of trunk <br />sewer and water facilities and a bike path. <br /> <br />Construction of these facilities will involve the removal of all vegetation within the <br />right-of-way on the north side of the road. In some cases, there will be additional <br />easements necessary to construct the trail. In these cases, the City of Ramsey will be <br />contacting you individually to acquire the necessary easements and review the proposed <br />construction. We expect the trail construction to begin in late July. There is no <br />construction expected to take place in the boulevards on the south side of Alpine east of <br />Tonto Street. <br /> <br />It is likely that this construction will necessitate the closing of Alpine Drive for 2-3 days <br />and likely that delays will be encountered. We will make every effort to shorten this time <br />period but much of what we do is weather dependent. It was not the intent of either the <br />City of Ramsey or Arcon that this street would need to be closed but after detailed <br />analysis of the plans, construction methods and OSHA requirements, there appears to be <br />no alternative. Construction activity that requires work on Alpine Drive will not <br />commence until after school ends to protect the safety of the children walking to school. <br /> <br />,! <br /> <br />-206- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.