|
STATEMENT OF WORK CERTIFIED
<br />
<br /> STATE OF MINNESOTA - DEPARTMENT OF TR_kNSPORTATION
<br />
<br />MAIN BODY ITEMS (Group Level Detail)
<br />
<br /> Item Contrac~ Unit Contract Contract To Dane To Date Grp Line
<br /> Nu~nbe r Item Unit Price Quantity Amount Quantity A~ount No. No.
<br />
<br /> 2521.511 50 MM BI%~3MINOUS W~K M2 6.30 2,965.00 18,679.50 4,790.00 30,177.00 001 1170
<br /> Totals for Proposal LAne Number 1170 2,965.00 $18,679.50 4,790.00 $30,177.00
<br />
<br /> 5 1 5 N R T E E % 21.28 428.00 9,107.84 355.00 7,554.40 003 1180
<br />
<br /> Totals for Proposal LAne Number 1180 428.00 $9,107.84 355.00 $7,554.40 ..
<br />
<br /> ~51.501 CONCRETE C-gRB & GU~'TER DESIGN M 24.79 16S.00 4,164.72 168.00 4,164.72 003 1190
<br />
<br /> TotaLs for Proposal Line Number 1190 168.00 $4,164.72 168.00 $4,164.72
<br />
<br />'!2531.501 CONCRETE CI/R8 & GU/~FER DESIGN M 26.10 8,515.00 222,241.50 8,536.00 222,789.60 001 1200
<br />
<br /> Totals for Proposal LAne Number 1200 8,.515.00 $222,211.50 8,536.00 $222,789.60
<br />
<br /> CONCRETE CIIRB & GU~ER DESIGN M' 22.85 886.00 20,245.10 1,264.00 28,882.40 005 1210
<br /> Totals For Proposa~ Line Number 1210 1,982.00 $45,2S8.70 2,323.0Q $53,080.55
<br />
<br /> 2531.502 CONCRETE CffJRB DESIGN S5 M 35.70 84.00 2,998.80 83.00 2,963.10 001 1220
<br />
<br /> Totals for Proposal LAne Number 1220 84.00 $2,998.80 83.00 $2,963.10
<br />
<br />1 2-531.507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 63.00 2,698.92 0Ol 1230
<br /> Totals for Proposal LAne Number 1230 228.30 $9,780.37 63.00 $2,698.92
<br />
<br />1 2540.602 MAIL BOX SUPPORT EA(Lq 125.00 4.00 500.00 4.00 500.00 001 1290
<br />
<br /> Totals for Proposal Line Number 1240 "~ 4.00 $500.00 4.00 $500.00
<br />
<br /> 2545.509 CONDUIT SYSTEM (SIGN~LLS) LS 14,362.00 0.80 11,489.60 0.80 11,489.60 001 1250
<br />545.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.10 1,436.20 0.10 1,436.20 003 1250
<br />
<br /> 2545.509 CONDUIT SYSTEM (SIGNALS) bS 14,362.00 0.10 1,436.20 0.10 1,436.20 005 1250
<br />
<br /> Totals for Proposal Line Number 1250 1.00 $14,362.00 1.00 $14,362.00
<br />
<br /> 2554.509 GUIDE POST TYPE 8 EACH 37.00 38.00 1,406.00 24.00 888.00 002 1260
<br /> 2554.509 GUIDE POST TYPE B EACH 37.00 5.00 185.00 5.00 185.00 004 1260
<br />
<br />1 ~554.509 GUIDE POST TYPE ~ EACH 37.00 4.00 148.00 0.00 0.0o 006 1260
<br />
<br /> Totals for Proposal LAne Number 1260 47.00 $1,739.00 29.00 $1,073.00
<br />
<br />557.603 WOODEN FENCE M 36.50 278.00 10,147.00 184.00 6,716.00 001 1270
<br /> 278.00 $10, 1~?.00 184.00 $6,716.00
<br /> Totals for Proposal LAne Number 1270
<br />
<br /> 2557 . 603 B~BED WIRE FENCE M 16.50 220.00 3,630.00 545.00 8,992.50 001 1280
<br />
<br /> Totals for Proposal Line Number 1280 220.00 $3,630.00 545.00 $8,992.50
<br />
<br /> LOW S.P. N~ER 199-010-03 FOR WORK COMPLETED AS OF 02/04/2002 Congract Number: Z00516
<br />
<br />-]29-
<br />
<br />
<br />
|