My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 03/12/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:05:37 AM
Creation date
9/3/2003 3:22:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-154- <br /> <br />(~) <br /> <br />(2) <br /> <br />(~) <br /> <br />(4) <br /> <br />(s) <br /> <br />(6) <br /> <br />(7) <br /> <br />(8) <br /> <br /> CITY OF RAMSEY <br />Street Maintenance Program Assessment Practices <br /> <br />For sealcoats and overlays the amount assessed to benefited property owner is <br />50% of the total project cost including overhead costs. <br /> <br />Projects involving streets which have had previous proposed maintenance projects <br />defeated by petition shall be ineligible to receive the City's 50% contribution, if <br />the project requires a more expensive maintenance. (i,e. streets proposed for <br />sealcoating project which was defeated by citizen petition now are proposed for a <br />bituminous overlay) <br /> <br />Projects are identified by individual subdivisions, or by grouping of subdivision <br />and lots having similar pavement histories and conditions and similar pavement <br />areas per benefited unit. <br /> <br />An assessment share will be calculated by determining the total assessable cost of <br />the project and dividing by the number of benefited units. <br /> <br />Where the rule of dividing the assessable project cost by the number of benefited <br />units (no 4 above) would result in an assessable share which is grossly out of <br />proportions to the assessable share being charged to similar lots receiving similar <br />improvements, the City Council may elect to assess such lots the average <br />assessable share being made to lots receiving similar improvements for that <br />project year. <br /> <br />Where an individual lot has more than one frontage and not all frontages are <br />scheduled to receive an improvement, or the same type of improvements, the lot <br />will be considered benefited and be assessed a full share for the improvement <br />which is conducted along the frontage of the lot that contains the main driveway <br />opening. <br /> <br />Where an individual lot has more than one frontage including a driveway frontage <br />on a state or county road, and a non-driveway frontage on a MSA or city street, <br />one-half assessment share will be made for an improvement to the MSA or City <br />street. <br /> <br />Where an individual Iot has a single frontage on an MSA street, such lots will be <br />assessed the average assessable share for the type of improvement made to non- <br />MSA streets receiving that improvement. <br /> <br /> ! <br /> I <br /> I <br />I: <br /> I <br />I <br /> <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.