My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 03/12/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:05:37 AM
Creation date
9/3/2003 3:22:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />INCORPORATED <br /> <br />WELL DRILLING FOR FOUR GENERATIONS <br />15588 JARVIS STREET N.W. / ELI( RIVER, MN 55330 <br />PHONE: (612) 427-6100 / FAX: (612) 427-0533 <br /> <br />I -- I <br /> <br /> CITY OF RAMSEY <br />I 15153 Ramsey Blvd Nw <br /> RAMSEY, MN 55303 <br />I ATTN: Mr. Mark Boos <br /> (753) 427-8254, (763) 286-0833 cell <br />I SUBJECT: City of Ramsey Well #2 irrigation <br /> <br />QUOTATION <br />ABB VFD, FILTER, TRANSDUCER <br /> <br />I <br /> <br />Dear Sir: <br /> <br />E.H. RENNER & SONS, INC. is providing you a quotation to furnish the following: <br /> <br />1. ABB ACH401602032 Variable Frequency Drive 480volt 38 amp in a Nema Type 1 <br /> Enclosure. For a Franklin 25hp 480v/60/3 motor. <br />2. TCI dV/dT Guard KLC filter <br />3. KELE PSS-2 pressure transducer <br /> <br />The above control equipment will be delivered to the pump house for installation by others. We <br />have included startup procedures and programming of the drive and 2 hours of training on its <br />operation for the City of Ramsey. <br /> <br />The VFD will require a signal from (1) the irrigation system to turn on/off and (2) from the <br />municipal system to mm on/off. The pressure transducer for the irrigation system MI1 be used <br />with the irrigation system to control the #1 set point and the existing pressure transducer or flow <br />meter would control the flow of#2 set point. <br /> <br />QUOTATION: <br />A. MATERIALS (#1-#3 ABOVE) <br />B. STARTUP & TRAINING (SSS/HR X 4) <br />C. O&M MANUALS <br />TOTAL QUOTATION <br /> <br />$4,275.00 <br />$ 34O.00 <br />$ 185.00 <br /> <br />$4,800.00 <br /> <br />An Equal Opportunity Employer -245- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.