Laserfiche WebLink
Hakanson <br />Anderson <br />Assoc., Inc. <br /> <br />3601 Thurston Avenue, Suite 101, Anoka, MN 55303 <br />Phone: 763/427.5860 Fax: 7631427-0520 <br /> <br />MEMORANDUM <br /> <br />TO: Brian Olson, City Engineer <br />FROM: Cralig Jochum <br />DATE: February 22, 2002 <br />RE: Storm Water Computations <br />Cc: Dwight Jelle, P.E. <br /> <br />STORM SEWER / HYDROLOGY <br /> <br />All 100-year flood elevations must be labeled on the grading plan for all ponding areas <br />including back-'yard areas. <br /> <br />The hydraulic gradellne for the 100 year storm event must be considered for all backyard <br />catchbasins, The gradeline must start at the discharge point and continue upstream. <br />This case appears to be more critical for some of the stormsewer in future phases, Set <br />100-yr flood elevations for all backyard Iow areas. Label the emergency overflows for <br />structures 75 and 76. <br /> <br />3. No computations have been provided for the storm sewer system in future phases. <br /> <br />Plans must be approved by Lower Rum River Watershed Management Organization. <br />Water quality ponds should have a 10:1 bench at the NWL. <br /> <br />Show the storm sewer on the grading plan. <br /> <br />10, <br /> <br />Check the runoff volume for water quality for streets only. Using the weighted curve <br />number for the runoff is not accurate. <br /> <br />Existing CN should be 39, there is greater than 7'5% grass Cover on the site. <br /> <br />Show the outlet for the existing pond in the park. Label the 100-year flood elevation and <br />show the proposed grading. <br /> <br />A 21" pipe flows to a 15" pipe in CBMH 104. this needs to be corrected, <br /> <br />11, <br /> <br />Will the existing pond in the park act as a water quality pond? If not, SRR6, DA-2 and <br />DA-3 will have to be treated. <br /> <br />~I2, <br /> <br />13, <br /> <br />Is ar~a SRR3 treated prior to entering SRR?'? <br /> <br />Tailwater needs to be considered when setting the flood elevation of the pond. <br /> <br />Civil & M,,m'cipal <br /> Engineering 25 <br />Zand Surveyingj3r 'r~ ,.7,,'""~ <br /> <br />Page 1 of 2-103- <br /> <br /> <br />