Laserfiche WebLink
-1t4- <br /> <br />10. <br /> <br />satisfaction of the City, any surplus balance remaining in the City's escrow account shall be <br />refunded to the DEVELOPER. <br /> <br />Stage I Improvement Maintenance Financial Guarantee. In addition to the financial <br />guarantee required by Paragraph 7 above, the DEVELOPER shall also post a Stage I <br />Improvement maintenance guarantee with the CITY. Said maintenance guarantee shall be <br />deposited with the CITY at the time Stage I Improvements are accepted by the CITY and <br />prior to release by the CITY of the financial guarantee required by Paragraph 6 above. The <br />amount of the maintenance guarantee shall be Ten Thousand Dollars and no cents ($10,000) <br />or five percent (5%) of the cost of the Stage I Improvements ($1,158,800.00), whichever is <br />greater. Said maintenance guarantee shall be held by the CITY for a one (1) year per/od <br />from the date of its deposit. This financial guarantee is for the purpose of ensuring that the <br />Stage I Improvements have been constructed in accordance with City standards and may be <br />called upon at the CITY'S discretion during said one (1) year period if the CITY determines <br />it necessary to repair and/or replace any of the Stage I improvements. Said financial <br />guarantee shall be in the form of a letter of credit, approved as to form by the CITY. The <br />maintenance guarantee shall be in the amount of equates Fifty Seven Thousand Nine <br />Hundred Dollars and no cents ($57,900) (5% x $1,158,800). <br /> <br />Payment of Sewer and Water Trunk Charges. There is a sewer and water development fee <br />of $284,798.00 (157 units x $1,814/unit) due on the Ultimate plat as reflected in the approved <br />preliminary plat. The City has requested the on site sewer be lowered to accommodate <br />expansion in the future. The cost of this work is estimated at $68,000. The DEVELOPER <br />has proposed that the remaining $2I 6,798 be used for off-site sewer and water improvements <br />required to provide sewer and water to the site. These improvements are estimated at Two <br />Hundred and Fifty Five Thousand Dollars ($255,000.00). Since the costs for the <br />improvements exceed the Sewer and Water Trunk Fee, there shall be no trunk fees collected <br />as part of this Development. <br /> <br />Stormwater Management Fee. There is a stormwater management fee of Twenty One <br />Thousand Seven Hundred and Fifty Dollars and-no cents ($21,750.00) (58 units'x $375/unit) <br />due on the first phase of this development. <br /> <br />Preliminary Plat approval was contingent upon addressing the drainage outlet to the north. <br />The DEVELOPER shall install an outlet from Woodland Green Park to the unnamed park at <br />the north end of the Plat, adjacent to 156th Lane N.W. The estimated cost of this <br />improvement is Eighty One Thousand Dollars and no cents ($81,000.00). The <br />DEVELOPER shall be responsible for this cost and any other requirement of the Lower <br />Rum River Watershed Management Organization. <br /> <br />As mentioned at the time of preliminary plat approval, the CITY has requested that a storm <br />sewer overflow be included as part of this Plat to protect the homes south of Alpine Drive <br />NW. The cost to construct this outlet within the boundaries of the Plat is estimated at <br />Twenty Six Thousand Dollars and no cents ($26,000.00), plus Thirty Nine Thousand Dollars <br />and no cents ($39,000.00) outside the boundaries of the Plat. This improvement does not <br />benefit the Plat. The DEVELOPER shall install, at its cost, the portion of the improvement <br />within the Plat. The CITY desires the DEVELOPER to construct the portion outside the <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br />I <br /> I <br /> I <br />I <br />I <br />I <br />I <br /> <br /> <br />