|
-116-
<br />
<br />STATEMENT OF WORK CERTIFIED
<br />STATE OF MINNESOTA - bEPARTMENT OF TRANSPORTATION
<br />
<br /> MAIN BODY ITEMS (Group Level Detail)
<br /> Voucher NO. 7 Sheet No: 17
<br />
<br /> Item Contract Unit Contract Contract To Date TO Date Grp Li~I
<br /> Number Item Unit Price Quantity Amount ~antity ;~ount No. No
<br />
<br /> 2565.511 FQT,L T ACT T CONTROL ~IGNAL SYSTEM B SIGS 119.759.00 0.50 59,879.50 0.45 53,891.55 001 1600
<br /> 2565.511 ~//LL T ACT T CONTROL SIGNAL SYSTEM a SIGS 119,759.00 0.50 59,879.50 0.50 59,879.50 003 16
<br /> Totals for Proposal Line Number 1600 1.00 $119,759.00 0.95 $113,771.05
<br />
<br /> 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM C SIGS 105,601.00 0.50 52,800.50 0.50 52,800.50 006 16't
<br /> Totals for Proposal Line Nu~%ber 1510 1.00 $10~,601.00 0.95 $100,320.95
<br />
<br /> 2565.511 FULL T ACT T CON'~ROL SIGNAJ~ SYSTEM O SIGS 120,544.00 1.00 120,544.0o 0.95 114,516.80 001 1620
<br />
<br /> Totals for Proposal Line Number 1620 1.00 $120,544.08 0.95 $114,516.80 ·
<br /> 2565.601 EMERGENCY VEHICLE PREEMPTION SYS B LS 5,100.00 0.50 2,550.00 0.45 2,295.00 001 1630
<br /> 2565.601 EMERGENCf VEHICLE PRE~4PTION SYS 8 LS 6,100.00 O.S0 2,550.00 0.50 2,550.00 {07 1630
<br /> Totals for Proposal Line Nu,%ber 1630 ~ 1.00 $5,100.00 0.95 $4,845.00
<br />
<br />2565,601 EMERGENCY VESICLE PREEMPTION SYS C [~ 5,100.00 0.50 2,550.00 0.50 2,550.00 005 L640
<br />
<br /> Totals for Proposal Line Nu:l~er 1640 1.00 $5,100.00 0.95 $4,845.00 ·
<br />2565.601 E~ERGENCY VEHIC[~ PREEMPTION SYS D I~ 5,100.00 1.00 5,100.00 0.95 4.645.00 001 1650
<br />
<br /> Totals for Proposal Line Nu,lber 1650 1.00 $5,100.00 0.85 $4,845.00
<br />
<br />2565.601 TPJkFFIC CONTROL INTERCONNECTION LS 32,]85.00 1.00 32,385.00 1.00 32,385.00 001 166
<br /> Totals for Proposal Lin~ Nu.~er 1660 1.00 $32,385.00 1.00 $32,385.00
<br />
<br />2571'.501CONIFEROUS ~R~E 1.2 M h"~ B&B TREE 205.00 · 41.00 8,405.08 0.00 0.00 001 167!
<br /> Totals for Proposal Line Number 1670 41.00 $8,405.00 0.00 $0.00
<br />
<br />2571.502 DECIDUOUS TREE 40 ~ C2%L B&S ~EE 205.00 8.00 1,640.00 0.00 0.00 001 168~
<br />2571.602 DECIDUOUS TREE 40 ~ CAL B&8 TREE 205.00 139.00 28,495.00 0.00 0.00 005 168
<br /> Totals for PrODosal Line Nu~%bsr 1680 147.00 $30,135.00 0.00 $0.00
<br />
<br />2573.501 8ALE C74ECK EAC~ 6.00 180.00 1,080.00 0.00 0.00 001 169'~
<br />2573.501 BALE C]{ECK EACH 6.00 30.00 180.00 0.00 0.00 003 169;
<br />2573.501 BALE CHECK EACH 6.00 10.00 60.00 0.00 0.00 005 169;
<br /> Totals for Proposal Liue Number 1690 220.00 $1.320.00 0.00 $0.00
<br />
<br />2573.505 FL~DTATION SILT CURTAIN ~'YPE STILLM 29.00 145.00 4,205.00 0.00 0.00 001 170(
<br /> Totals for Proposal Line Number 1700 145.00 $4,205.00 0.80 $0.00
<br />
<br />LOW S.P. NL%~ER 199-010-03 FOR WORK COMPLE"FED AS OF 02/27/2001 Contract Number: Z00516
<br />
<br />
<br />
|