Laserfiche WebLink
-124- <br /> <br />SUMMARY OF OVERRUN QUANTITIES <br /> <br />The Eollowln§ Body Items overran by 20.00% or more, based on che contract quantities. <br /> <br /> Sheet No: 25 <br /> <br />Item Number Description Group Unit To-Oate-Quan~ Prop-Quant Percent-Over <br />Body Items ......................................................................................................................... <br /> <br />2101.502 CLEARING 001 'fl{BE 225.0000 118.0000 ~90.6780% <br />2101,502 CLEARING 005 TREE 137,0000 21.0000 652.3810% <br />2!0!.506 GRUBB~G 001 HA 1.2780 1.0500 121.7143% <br />2101.507 GRUBBING 001 TREE 229.0000 118.0000 194 ,0678% <br />2101.507 GRUBBING 005 TREE 133.0000 21.0000 633.3333% <br />2102.502 PAVEMENT btARKI~;G REMOVA~ 003 M 1253.0000 720.0000 174.0278% <br /> <br />2104.501 REMOVE OJRB ~dgDGraTER 005 M 186.0000 122.0000 152.4590% <br /> <br />2104.501 REMOVE FENCE 001 M 710.0000 313.0000 226.8371% <br />2104.501 R~74oxrE FENCE 005 M 448,0000 274.0000 162.5036% <br /> <br />2104.503 REMOVE BI~73~INOUS WALK 0O~ M2 2875.0000 1030.0000 279.1262% <br />2104.503 REHOVB CONCRETE WAL?~ 001 H2 42.0000 30.0000 140.0000% <br />2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT 001 M2 383.0000 296.0000 129.3919% <br /> <br /> I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br /> <br /> <br />