Laserfiche WebLink
-288- <br /> <br />Il. <br /> <br />11. <br /> <br />12. <br /> <br />STORMWATER MANAGEMENT FEE. The City has enacted a Stormwater <br />Management Fee in the amount of Three Thousand Six Hundred Fifty Eight Dollars <br />($3,658.00) per commercial acre. The amount of Stormwater Management Fee due on <br />the Site is Five Thousand One Hundred Twenty One Dollars ($5,121.00) (1.4 acres x <br />#3,658/acre). A cash payment will be required prior to the City releasing the Building <br />Permit. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Ch/el. <br /> <br />LIGHTING. Any lighting installed on the structure or in the parking lot is subject to the <br />prior approval of the City Engineer and shall be designed so as to deflect light away from <br />T.H. #47 and Xkimo Street. Bulbs emitting in excess of 3,000 lumens (150 watts) shall <br />be so directed'that.the bulb is not visible from offof the property where such light source <br />.is located. -- <br /> <br />BUILDING FACADE. The Permittee agrees to 'construct a brick and rock faced <br />concrete masonry unit building in accordance with the B,uilding Elevations prepared by <br />Insites Architecture dated September 12, 2000. <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for the Site will be issued until the Permittee has: <br />a) signed and returned this Development Permit; b) provided the required financial <br />guarantee in accordance with Paragraph 12 of this Permit. c) provided the City with a <br />copy of the Grading and Drainage Permit issued by the Lower Rum River Water <br />Management Organization d) provided the City with a copy of the grading permit issued <br />by the Minnesota Department of Transportation. No Certificate of Occupancy for the <br />structure will be issued until the Required Improvements, or a financial surety for same, <br />are accepted by the City. . <br /> <br />IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements <br />shatl be completed before January.2, 2002. <br /> <br />ESCROW FOR'REQUIRED IMPROVEMENTS. In order to insure the installation of <br />the Required Improvements in accordance with City specifications and in a timely <br />manner, the Permit-tee shall be required to deposit with the City a cash escrow or letter of <br />credit, approved as to form by the City, in the amount of Sixty-Four Thousand ($64,000), <br />which is 150% of the City's estimated cost of the Improvements. Prior to the issuance of <br />the building permit, all financial guarantees must be provided as required herein. <br /> <br />Upon completion of the construction of the Required Improvements, the financial <br />guarantee shall be returned to the Permittee and the Permit-tee shall be required to provide <br />the landscaping maintenance guarantee described in Item #13 of th.is Development <br />Permit. The determination of completion of the construction of the Required <br />Improvements shall be made by the City Council after consultation with the City <br />Engineer. In the event the Permittee fails to construct and install the Required <br />Improvements as required herein, the City Council may order the completion of the <br />Required Improvements with City day labor and/or by letting contracts for said <br />completion and draw upon the escrow for payment. Only the City Council shall have the <br />authority to direct completion of the Required Improvements and withdraw fi'om the <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br /> <br />