Laserfiche WebLink
88 <br /> <br />The single-family lots abut urban size residential lot to the north and west and two large single <br />family lots to the south that are buffered by wetlands. The single-family lots all meet the minimum <br />dimensional and area requirements with the exception of Lot 6, Block 1 which is deficient in lot <br />width. <br /> <br />The townhomes will be adjacent to the new single-family lots and a large single-family lot along <br />Nowthen Blvd. The apartments will be across the street from the newly constructed seniors <br />apartment building. <br /> <br />The development will gain primary access from Nowthen Blvd. and secondary access from Iodine <br />St. N.W. As part of the plat, 145th Court in Wood Pond Hills will be extended another 200 feet <br />to serve additional lots being created as part of this plat. The sketch plan does not show any <br />proposed access to or from the subdivision using Fluorine St. N.W. <br /> <br />The development is proposing to use Outl0t A and B of Wood Pond H_ills 4t~. Addition in <br />combination with land on the development property to create 10 new single family lots and <br />complete 145~' Court. Two existing lots on the south side of 145t~ Court are shown as receiving <br />additional land in their rear yards. <br /> <br />The drives serving the townhomes and the apartment building will be private and maintained by <br />the Homeowners Association. City ordinances state that private streets shall not be allowed in <br />Ramsey. However, past practice has been to allow them in certain developments. Staff questions <br />whether the access between the townhomes and the apartment building is necessary since that <br />access would possibly be used by a significant portion of the townhouse residents. Staff would <br />prefer that most of the residents used the access onto Nowthen Boulevard. <br /> <br />All public and private streets shall be named in conformance with the City's street grid pattern. <br />The Preliminary Plat should show how the proposed access points on CSAH 5 and Dysprosium <br />St. line up in relation to the uses across the right-of-way. <br /> <br />The recently adopted sidewalk ordinance calls for sidewalk to be installed on all roads except cul- <br />de-sacs. The concept plan does show a continuation 'of the City trail'system through this <br />property. This matter will be reviewed in further detail by the Park Commission. <br /> <br />Site Plan Review of the apartments and townhomes will be done at the same time as the rezoning <br />and plat review is being conducted. The townhomes are proposed as eight-unit buildings. The <br />apartment building is proposed to be a cooperative senior housing project which means the <br />residents will own and operate the apartment building. It will be a three-story structure. <br /> <br />Grading and drainage, traffic generation reports, site improvements, etc., will be addressed in <br />detail as part of the preliminary plat and rezoning process. It should be noted that the concept <br />plan does not show drainage ponds to handle the treatment of runoff' prior to discharge into <br />wetlands and/or the City storm sewer system. The development may need to be altered to <br />accommodate this need. <br /> <br />The Planning Commission reviewed the concept plan at its March 6t~ meeting. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />! <br /> <br /> <br />