My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/10/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 04/10/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:20:53 PM
Creation date
9/4/2003 11:44:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> i <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />g) <br /> <br />Whole trees may not be disposed of by burning. Trunks and limbs larger than six (6) <br />inches in diameter must be salvaged for lumber, firewood, chipped or hauled to a <br />licensed wood disposal site. Application may be made for an open burning permit to <br />dispose of brush less than six (6) inches in diameter and stumps with less than four <br />feet of main trunks attached. The location of the proposed open burn site will be <br />specified by the City Engineer, Environmental Specialist and Fire Chief. Wood <br />disposal by burning requires whole tree volume reduction, proposed site inspection <br />prior to cleating and an open burning permit. Residual ash and unburned stumpage <br />may be buried on the site at the direction of the City Engineer. Chipped material <br />may be applied and utilized on site to mitigate root damage from grade changes of <br />the easement or right-of-way and for erosion control and top soil restoration. <br /> <br />SECTION VII <br />GENERAL <br /> <br />Boulevard and Area Restoration. The DEVELOPERS shall be responsible for the cost <br />of establishing seed in all boulevards within th/rty (30) days of the completion of the <br />street improvements, and restoring all other areas disturbed by the development grading <br />operation in accordance with the approved erosion and sediment control plan. The <br />DEVELOPERS shall also be responsible for the cost of cleaning any soil, earth or debris <br />from the wetlands within and adjacent to this Plat resulting from grading performed in the <br />development of the land. <br /> <br />Construction Site Maintenance. The DEVELOPERS shall adhere to all City <br />ordinances relating to, but not limited to, dumping of garbage, site development, <br />construction debris, open burning, etc. <br /> <br />Estimated Cost. It is understood and agreed that cost amounts set forth in this <br />Agreement as Stage I and Stage II Improvements, unless specified as fixed amounts, are <br />estimated. The DEVELOPERS agree to pay the entire cost of said improvements <br />including interest, engineering and legal charges. <br /> <br />Plat Approval Expenses. The DEVELOPERS agree that it will pay to the CITY all <br />CITY expenses incurred in the approval of the Plat, including, but not limited to <br />administration expenses, engineering and legal fees. Said expenses shall be paid within <br />fifteen (15) days of billing by the CITY and outstanding billings shall be paid prior to <br />recording of the Final Plat. Any expenses incurred after recording of the Final Plat shall <br />also be;paid within said fifteen (15) day billing period. Failure to pay the CITY-'S. <br />expenses within the fifteen (15) day billing period will permit the CITY to draw upon <br />any of the escrows required by this contract for payment. <br /> <br />Reimbursement to the City. The DEVELOPERS agree to reimburse the CITY for all <br />costs incurred by the CITY in defense or enforcement of tkis Agreement, or any portion <br />thereof, including court costs and reasonable engineering and attorney's fees. <br /> <br />-193- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.