Laserfiche WebLink
I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />of the building. Staff is recommending that the fence be constructed out of a wood <br />material or materials that closely match the exterior wall finishes on the building. The <br />is proposing to utilize an existing driveway to access the equipment building. There <br />personnel stationed at the site on a permanent basis. She advised that the <br />discussed this application at a recent work session and would like to hire <br />detenuine how many more users can go onto this tower and explore <br />constructing an equipment building to accommodate all possible future <br />process of finding a consultant io conduct that study. She advised that <br />informed of this and the City's willingness to consider a <br />such time that a permanent building is construCted. The City <br />proposed lease agreement from Verizon Wireless. 'Verizon <br />lease agreement with the City of Ramsey for water tower <br />$12,732 annually. City staff recommends approval <br />landscape plan; the fence being constructed out of that <br />surrounding properties, and the City entering 'into <br /> <br />to <br /> <br /> building <br /> gth <br /> !sing to enter into a <br />space in the amount of <br /> upon an <br /> 00% screening from <br /> <br />Citizen Input <br /> <br />Chairperson Nixt questioned the ability to create or reasonableness <br /> <br />screening. <br /> <br />,I <br /> I <br />:1 <br /> I <br /> <br />Jim Nelson, of Buell Consulting <br />working with City staff on <br />for the City to build their own <br /> <br />some <br /> <br /> he has been' <br />about the potential <br /> <br />Chairperson Nixt asked Mr. Nelson to <br /> <br />building. <br /> <br /> Mr. Nelson stated~thei~eqEi, pwent building to be a climate controlled structure to <br /> house the radio}!e0ntrolled;eq.Uipment. The are maintained on a monthly basis to <br /> assure everything is operatmg!~correctly. He security would be an issue for Verizon <br /> Commu/iicafions and they with placing their equipment into an open <br /> area .tha¢??~iccessible the potential of the City constructing the <br /> equipment but it is his past experience that would be <br /> an unusual is unsure what the issues are since he was not in <br /> ~;;-~':~attendance at the d'3hhCil meeting but believes they are probably related to aesthetic. <br /> <br /> Chairper§0n"Nixt stated that ~iSUtd also be his assumption given this location in a predominantly <br /> residential area::~ <br /> <br /> Commumty Development Assistant Wald stated the C~ty Council d~d not want four d~fferent <br />.... ~"~:' ~., ...... <br /> bmldmgs at the'..base of this property, due to aesthetics, and s~nce ~t is surrounded by residential. <br /> <br /> "'%}TChairperso~/'.Ni'xt asked if these antennas will also provide paging so another user may not be <br /> '~'fe~ible,dfi¢;t~) conflicting signals. <br /> <br /> ~!'7'N~ison stated he is not an engineer but it is his understanding that Verizon's first thought <br /> w~S to locate on the top of the tower tank. However, after revising their coverage area, it was <br /> <br /> Planning Commission/April 3, 2001 <br /> Page 3 of 18 <br /> <br />-23- <br /> <br /> <br />