Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Kirk Schm tker <br />April 10, 2001 <br />p.g. 2 <br /> <br />Moving of the following items located around the property. Submitted by Sundman <br />Paving and Sealcoating. <br /> <br />20 tons of ductile pipe. <br />Galvanized pipe. <br />Metal Hoisting Frame. <br />12000 Gallon tank. <br /> <br />40 ft. flatbed. <br />Old one ton flatbed. <br />Timbers and misc. steel. <br /> <br />** After speaking with representatives with Kenko it was determined that the 12000 gallon tank <br />belonged to them. Therefore the initial bid of $10,250.00 needs to be reduced. <br /> <br />Total cost $7,500.00 <br /> <br />VI. (a)Amer/can Crane startup, removing crane from mainframe, loading and unloading <br /> crane in Iow bed trailer, set equipment back up. (b)Maintenance crane inside <br /> maintenance shop, remove from ceiling and breakdown, load item, unload item, rewire <br /> crane and install.(c)Site location search for American Crane, Braham, MN area. Bid <br /> submitted by Royal Concrete. <br /> <br />Total cost 56 hours at $50.00 or $2,800.00. <br /> <br />Total eligibIe relocation costs submitted. <br /> <br />$48,340.00 <br /> <br />If you have any further questions regarding these fi~m.tres please give me a call. <br /> <br />Relocation Consultant for the City of Ramsey. <br /> <br />-101' <br /> <br /> <br />