Laserfiche WebLink
-160- <br /> <br /> WHEREAS, the DEVELOPER desires to construct the Stage I and Stage II <br />improvements, except for those Stage II Improvements constructed by the CITY. <br /> <br />NOW, THEREFORE, the CITY and DEVELOPER agree as follows: <br /> <br />STAGE I IMPROVEMENTS AND FINANCIAL GUARANTEES <br /> <br />Ci'tv Code Compliance. That the DEVELOPERS will develop the Plat in <br />accordance with the City Code, Section 9.50, entitled "Subdivision" and Section <br />9._0..~ 1 entitled "Planned Unit Development". <br /> <br />Conformance with Plan. The Plat shall be developed pursuant to the proposed <br />final plat consisting of four (4) sheets prepared by Ulteig Engineering, Inc., dated <br />received by the CITY on July 26,2001. <br /> <br />Incorporation of All City. Code Requirements, That the recitals above and the <br />provisions of the City Charter, Subdivision Code, Zoning Code and Public <br />Improvement Code of the CITY as amended to date hereof, are incorporated <br />herein by reference. <br /> <br />Stage I .Improvements Required. The DEVELOPER agrees to construct the <br />required Stage I Improvements according to the terms and conditions of this <br />contract and in accordance with DEVELOPERS' plans submitted to the CITY. <br />Said plans shall consist of the Storm Sewer and Street Improvements for <br />Northfork St. Andrews Addition prepared by Rich Revering, PE and dated July <br />19, 2001. The improvements the CITY requires the DEVELOPER to construct <br />within the Plat are as follows: <br /> <br />Streets with bituminous curb <br />Lot grading and permanent erosion control <br />Natural gas <br />Telephone service <br />Electric service <br />Street lights (installment arranged by CITY during Stage I Improvements <br />and paid for by DEVELOPER as Stage II Improvement) <br /> <br />(" Stage I Improvments") <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall be responsible for <br />the cost of establishing seed or sod in all boulevards within thirty (30) days of the <br />completion of the street improvements, and restore all other areas disturbed by the <br />development grading operation in accordance with the approved erosion and <br />sediment control plan. The DEVELOPER shali also be responsible for the cost <br />of cleaning any soil, earth or debris from the wetlands within and adjacent to this <br />Plat resulting from grading performed in the development of the land. <br /> <br />Requirements After Street Surfacing..After the street surfacing is installed, the <br />DEVELOPER shall clear any soil, earth, or debris from the streets and from the <br />lots within the Plat resulting from any construction on the Subject Property by the <br />DEVELOPER or their successors and assigns. <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br /> <br />