PAY ESTIMATE NO. 4
<br />
<br />Engineer
<br />
<br />No. Spec. Ref. Description Estimated Contract Unit Price-'~ontract Amount Used to Dat~ Extension
<br />
<br /> 9 2211.501 '"Aggregate Base Class 5 809 TON $9.00 TON $7,281.00i $
<br />
<br /> 10 2340.508 Type 41 Wearing Course Mixture 198 TON .. $47.00 TON $9,306.00 $
<br />
<br /> 11 2340.51 Type 31 Binder Course Mix!.ure 13 TON $130.00 TON $1,690.00 $
<br />
<br /> 12 2340.514~. Type 31 Base Course Mixture 13 TON $130.00 TON $1,690.00 $
<br /> 13 2357,502 Bituminous Material forTack C~at 10 GAL $10,00 GAL $100.00
<br />
<br /> 14 24tl.507 ~oncrete Weir · 1 EA $1,000.00 EA , $1,000.00 $
<br />
<br /> 15 2501.620 Bulk Heads 5 E"A $200.00 EA $1,000.00 $
<br />
<br />16 2503.541 18" Corrugated Polyethylene Pipe ~ 16 LF $27.00 LF $432.00 $
<br />· ,,17 2503,541 24" Corrugated Po. ly, ethylen, e. Pipe ~ 787 LF $24.00 LF $18,888.00! $
<br />18 2503,541 30".Corrugated Polyethylene Pipe ~ 438 LF $33.00 LF $14,454.00! . $
<br />19 2503.541 36" Cor, ru. gated Polyethylene Pipe ~ 722 LF $38.00 LF $27,436.00
<br />20 2503,541 36" RC Jacking Pipe (Install by Jacking) 56 LF $350.00 LF, $19,600.00 $
<br />21 2503.541 36" RC Jacking Pipe (install by Open Cut) 8 LF $125.00 LF $1,000.00 ._. $
<br />
<br /> 22 2506.501 Construct Drainage Structure Design - 60 1 34.68 LF $230.00 LF $7,976.40i $
<br /> 23 2506.501 Construct Drainage Structure Design- 72 ~ 11.32 LF $300.00 LF $3,396.0.01 $
<br /> 24 2506.501 Construc! ,D.r, ainage Structure Design - 841 8.42 LF $400.00 LF I $3,368.00! $
<br /> 25 2506.602 Connect to Exis!ing Catch Basin 2 EA $200.00 EA I $400-00! $
<br />
<br /> 26 2506.602 Casting Assemblies Type.1 5 EA $200.00 EA $1,000.00, $
<br />
<br /> 27 2506.602 .~Casting Assemblies T.y,.pe 2 I EA $500.00 EA ., $500.00 $
<br /> 28 2563.601 !Traffic Control 1 LS $1,000.0(~ LS '$1,000,00 ,, $
<br />
<br /> 29 ~2573.501 Bale Check 20 EA $10.00 ~,~ $200.00 $
<br /> 30 2573.603 Silt Fence · , 50 LF $2,00 LF $100.00 $
<br /> 31 2575.609 Turf Establishment 1.5 ACRE $2,000.00 ACRE $3,000.00! $
<br />
<br />Total Bid Schedule "B" $136,588.40
<br />
<br />SUMMARY OF BIDDING:
<br />Bid Schedule "A" - Phase I Construction
<br />
<br />Bid Schedule "B" - Phase 2 Construction
<br />
<br />Total Contract Amount
<br />
<br />Total Used To-Date
<br />
<br />Less 5% Retainer
<br />
<br />Less Pay Estimate No 1
<br />
<br />Less Pay Estimate No 2
<br />
<br />Less Pay Estimate No 3
<br />
<br />Less Railroar~ insurance
<br />
<br />We Recommend Payment of:
<br />
<br />$128,929.20 $126,600.20
<br />$136,588.40 $
<br />$265,517.60
<br />
<br />$126,600.20
<br />$6,330.01
<br />$38,954.94
<br />$33,725,00
<br />$31,254.90
<br />$800.00
<br />$15,535.35
<br />
<br />Revised per Supplemental Agreement No, 1.
<br />
<br /> \~,ha01 ~shared docs\municipal~ararnsey~ra417pe4,xls
<br />
<br />-120-
<br />
<br />8/17/01
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br /> I
<br />
<br /> I
<br />I
<br /> I
<br /> I
<br />
<br />
<br />
|