Laserfiche WebLink
BID SCHEDULE "C" - STORM SEWER <br />Item Description <br /> <br />20 iConnect to Ex. Storm Sewer <br />21 i12" RCP (CLS) (0'-8' Depth) <br />22 !15" RCP (CLS) (0'-8' Depth) <br />23 i16" DIP (CL51) (0'-8' Depth) <br /> <br />24 121" RCP (CL3) (0'-8' Depth) <br /> <br />25 "124" RCP (CL3) (0'-8' Depth) <br /> <br />26 i24" RCP (CL3) (10'-12' Depth) <br />27 i30" RCP (CL3)(8'-10' Depth) <br /> <br />29. <br />3O <br /> <br />31 <br /> <br />32 <br /> <br />30" RCP (CL3) (12'-14' Depth) <br /> <br />36" RCP (CL3) (0'-8' Depth) <br /> <br />36" RCP (CL3) (12'-14' Depth) <br /> <br />42" RCP (CL ~) (0'-8' Depth) <br /> <br />42" RC Jacking Pipe (0'-8' Depth) Open Cut <br /> <br />42" RC Jacking Pipe (8'-10' Depth) Open Cut <br /> <br />'42" RC Jacking Pipe-install by Jacking <br /> <br />35 <br />38 !12" Dia. Concrete Plug <br />37 i!5" Dia. Concrete Plug <br />38 i21" Dia. Concrete Plug <br /> 39r 24" Dia. Concrete Plug <br />40 36" Dia. Concrete Plug <br />41 i36" RCP FES W/Trashguard <br />42 142" RCP FES W/Trashguard <br /> IConstruct Standard Catchbasin (2'x 3') <br />44 IConstruct CB-MH 48" Dia. (0'-8') <br />45 Construct CB-MH 54" Dia. (0'-8') <br /> <br />46 Construct CBMH 72" Dia. (0'-8') <br /> <br />47 Construct MH 60" Dia. (0'-8') <br /> <br /> PAY ESTIMATE #3 <br /> CFf'Y OF RAMSEY <br /> 141'~ AVENUE N,W. <br />EBONY ST. N.W. AND BASALT ST. N.W. <br />UTILITY AND STREET IMPROVEMENTS <br />IMPROVEMENT PROJECT NO. 00-35 <br /> Phase I <br /> Estimated Contract Unit Contract <br /> Quantity Price Amoun[ <br /> 2i ^ I 1oo.oo I,E, <br /> 42iLF $ 19.30 <br /> 54tLF $ 20.70 I/LF <br /> <br /> 402 LF $ 25.00 <br /> 1001LF $ 26.70 /LF <br /> <br />131 LF <br />I80 LF <br /> 701LF <br />5361LF <br /> 52FLF <br /> 321LF <br /> 39 LF <br /> <br /> 7 _LF <br /> 901LF <br /> 1 EA <br /> 7 EA <br /> <br /> 1 EA <br /> l lEA'" <br /> 1 lEA <br /> <br /> 1 <br /> <br /> 1 <br /> 3lEA <br /> <br /> 1 <br /> <br /> 1 EA <br /> 2 EA <br /> <br />48 Construct MH 66" Dia. (0'-8') <br /> <br />49 Construct MH 78" Dia (0'- 8') <br />50 Extra Depth Manhole 54" DIA. (:>8) 0.21LF <br />50A" Extra Depth Manhole 72" DIA (>8) 4.4 LF--~ <br />51 60" Dia. Skimmer Structure with Weir (0'-8') !lEA <br />52 Class II1 Random Rip-Rap 16.1!CY <br />53 Remove 15" Dia. Conc. Plug 1lEA <br />54 IRemove Ex. 15" RCP 201LF <br /> 1,o6819F <br /> <br />55 12" insulation <br /> <br />55A' [18" CMP <br /> <br />558* i15" RCP FES <br /> <br />55C',[Conduits <br /> <br />550' lConstruct Manhole on Existing storm sewer <br /> <br /> Field Change <br /> <br />Total Bid Schedule "C" - Storm Sewer <br /> <br /> s,..hC,.red docslmumc~padaramseylS1601RA3160 EE AND BP.XLS <br /> <br /> --1 Pay =sumate 3 Phase i <br /> <br />401LF <br />2tEA' <br /> <br />3lEA <br /> <br />I lEA <br /> <br />JsCd m Date <br /> <br />200.00 2 <br />810.60 56 <br />1,117.80 92 <br /> <br />2,670.O0 <br /> <br />Extension <br /> <br /> 200.00 <br />1,080.80 <br />1,904.40 <br /> <br />860.00 20 $ 860.00 <br />10,050.00 11,200.00 <br /> 2,670.00 <br /> <br />28.70 I/LF [$ 172.20 <br /> <br />$ 4t .05 <br /> <br />39.05 I/LF [$ 511 ~ 5'55 <br />40.O5 I/LF $ 7,209.00 <br />I/LF $ 2,873.50 <br />t/LF '$ <br />I/LF $ <br />I/LF $ <br />/LF $ <br /> <br /> /LF $ <br /> I/LF $ <br /> lEA [$ <br /> /EA [$ <br /> <br />$ 55.45 <br /> <br />28,649.20 <br /> <br />2,883140 <br /> <br />2,315.20 <br /> <br />44; <br /> <br />100 <br /> <br />1311 <br />180f <br /> <br />$ 72.35 <br /> <br />$ 155.10 <br /> <br />172.20 <br /> <br />5,115.55 <br /> <br />7,209.00 <br /> <br />70 $ 2,873.50 <br />534! $ 28,542.30 <br /> <br />$ 155.10 <br />$ 507.00 <br /> <br />521 $ 2,883.40 <br />42i $ 3,038.70 <br /> <br />38 $ <br /> <br />6,048.90 5,893.80 <br />1,085.70 8 $ 1,240.80 <br />45,630.00 44,616.00 <br />73.00 146.00 <br /> <br />73.00 <br />79.00 553.00 237.00 <br />113.00 113.00 113.00 <br /> <br />IlEA iS <br /> <br />$ 144.00 <br /> <br />$ 181.00 lEA $ <br />$1,970.00 lEA $ <br /> lEA I$ <br /> lEA I$ <br /> <br />$2,302.00 <br />$ 852.OO <br />$1,338.00 <br />$2,042.00 <br />$2,731.00 <br /> <br />$2,124.00 <br /> <br />$2,415.00 <br /> <br />$3,222.00 <br />$ 145.00 <br /> <br />$ 200.00 <br /> <br />$2,910.00 <br /> <br />$ 75.00 <br /> <br />144.00 144.00 <br />181.00 <br />1,970.00 1,970.00 <br />2,302.00 2,302.00 <br /> <br />852.00 <br /> <br />88 $ <br /> <br /> 2 $ <br /> <br /> 3 $ <br /> <br /> 1 $ <br /> 1 $ <br /> <br /> 0 $ <br /> <br /> 1 $ <br /> <br /> 1 $ <br /> <br /> 0 $ <br /> <br /> 4 $ <br /> <br /> 1 $ <br /> <br /> 2 $ <br /> <br />29.00 <br /> <br /> 4,014.00 5,352.00 <br /> 2,042.00 2,042.00 <br /> 2,731.00 5,462.00 <br />. 2,124.00 I $ 2,124.00 <br /> 2,415.00 ~ $ <br /> 6,444.00 $ 6,444.00 <br /> <br /> 29.00 <br /> <br />880.00 <br /> <br /> 810.60 <br />1,207.50 <br /> <br />50.00 <br /> <br />300.00 <br /> <br />2,830.20 <br /> <br />1,400.00 <br /> <br />1 0a4 00 <br /> <br />1,050.00 <br /> <br />3,556.00 <br /> <br />$ .-50.00 <br /> <br />$ 15.00 <br /> <br />$ 2.65 <br /> <br />$ 35.00 <br /> <br />522.00 <br /> <br />$ 350.00 <br /> <br />156,806.35 <br /> <br />0.2[ $ <br />4.4 $ <br /> <br />26.3; <br />0 <br />20 <br />736 <br />40 <br />2 <br /> <br />$3,556.00 <br /> <br />lEA <br />lEA <br /> <br />lEA <br />'lEA <br /> <br />/LF <br /> <br />lEA I$ <br />ICY IS <br />lEA $ <br />/LF $ <br />/SF $ <br />I/LF $ <br />lEA $ <br />lEA [$ <br /> <br />lEA <br /> <br />880.00 <br /> <br />2,910.00 <br /> <br />1,972.50 <br /> <br />300.00 <br /> <br />1,950.40 <br /> <br />1,400.00 <br /> <br />1,044.00 <br /> <br />1,050.00 <br /> <br />3,556.00 <br /> <br />160,928.35 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> <br />