Laserfiche WebLink
I <br />:1 <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />.JAYMES D. LrrTLEaOFIN <br />612.347.0274 <br />Littlcj ohnJ(/~)~moss-barnett.com <br /> <br />July 17, 2001 <br /> <br />MOSS <br /> <br />& BARNETT <br /> <br />A Profcssmna[ AssoctaLtoa <br /> <br />4800 Wells Fargo Center <br />90 South Seventh Street <br />Minneapolis, MN 55402-4129 <br />Telephone 612.347.0300 <br />Facsimile 612.339.6686 <br />www. moss-barnett.com <br /> <br />VIA MESSENGER <br /> <br />Planning Commission and City Council <br />c/o Ms. Megan Wald <br />City of Ramsey <br />15153 Nowthen Blvd. <br />Ramsey, MN 55303 <br /> <br />Re: Proposed Cellular Telephone Base Station for Sunwood Drive Water Tower <br /> <br />Dear City Council Members and Planning Commissioners: <br /> <br /> Our firm represents Verizon Wireless (VAW) LLC, who provides Vedzon Wireless service <br />to the Ramsey area and much of Minnesota. As such, this letter accompanies an application for a <br />Conditional Use Permit as required by § 9.15.04 (b)(2) for a cellular telephone base station (also <br />known as a "cell site") to be located on the water tower referred to above. The site is zoned BW <br />(Business Warehouse District), and is located near buildings that involve commercial and <br />warehouse uses. The undeveloped land immediate adjacent to the site is similarly designated. <br /> <br /> Since your City recently considered and approved a conditional use permit for one of our <br />client's installations elsewhere in Ramsey, and since the lease form has been negotiated which <br />satisfies the requirements of § 9.15.04, we will not go ir}to great detail to discuss this particular site, <br />but we have enclosed the site plans, elevations and landscape plan for your reference. <br /> <br /> The proposed cell site will help meet the increased demands for cellular telephones in the <br />area, enable Verizon Wireless provide better service to residents and business people of Ramsey and <br />otherwise benefit the City through the payment of non-tax revenue in the form of rents to the City. <br />The City attorney has approved a ~orm of lease to be used, we hope to have the zoning and leasing <br />complete soon so that our client is able to comm~ence construction as soon as the water tower's <br />construction is sufficiently complete to accept the installation. <br /> <br /> The Proposed Use. Every ceil site has two-essential elements: antennas and cellular <br />telephone radio/switching equipment. For the antenna structure, we propose to install the <br />antennas on the colurrm of the water tower, 110 feet above ground level. The cellular equipment <br />will be housed in a 12-foot by 30-foot equipment building near the base of the tower. Access to the <br />site will be gained via the drive that will be installed by the City for its own access. All of the <br />proposed improvements to the property, as well as the existing structures and property lines, are <br />depicted on the accompanying site plans and elevations. <br /> <br />-337- <br /> <br /> <br />