Laserfiche WebLink
I <br /> I <br /> i <br /> I <br /> i <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> I <br /> I <br /> ! <br /> I <br />I <br />! <br />I <br />I <br />I <br /> <br />Section D - FOUNDATIONS <br /> <br />DI Unless other,vise stated In the proposal, Purchaser shall furnish <br />the foundations, including grouting, or grade or other suppo~ and shall <br />assume full responsibility for the adequacy and acoxacy of the <br />foundations or grade or supports. Purchaser shall fill In al excavations, <br />level the grade, and remove all obstructions In the vicinity of the <br />construction site before construction is started. Contractor will supply <br />anchor bolts only when so spec;fred In the proposal. <br /> <br />D2 Purchaser shall assume full responsibil~ for the beaing capacity <br />of the soil upon which the structure or the foundation is stq~ported. Any <br />damage to the foundations or structures caused by failure of the soil to <br />support the loads upon it shall be repaired at not cost to Coatractor. <br /> <br />D3 if the structure or any part of it Is to be constructed inside of or <br />upon an existing building or supports, Purchaser shal assume full <br />responsibility for the ability of the building or supports to sustain the <br />loads to be imposed. Any damage to the building or supports, to the <br />structure, or to any part thereof, because of the Inability of the building <br />or supports to support these loads, shall be repaired at no cost to <br />Contractor. <br /> <br />D4 Foundations shall be constructed to tolerances '~'flich permit <br />proper erection of the structure without excessive shimming or leveling. <br /> <br />DS When the foundations are to be designed or built by Contractor, <br />Purchaser shall provide a subsurface investigation rel3mt by a soils <br />engineer, specific to the Structure site, or where applicable, multiple <br />Sb-ucture sites, providing sufficient information for Contractor to design <br />and build such foundations. When conditions are found lttat differ from <br />those contemplated in the proposal or shown on the sul:~urface report <br />or result from inadequate prior subsurface investigation Bcluding but <br />not limited to requirements for welt-pointing or piling or wet er reck <br />excavation, the price and delivery schedule shall be appropriately <br />adjusted. All costs for obtaining adequate subsurface investigation and <br />modification in design or construction because of subsurface conditions <br />not disclosed by or which are varying significantly from tJ-~ose assumed <br />or given in the prior subsurface investigation report ~ be for the <br />account of the Purchaser. <br /> <br />Section E - WELDING <br /> <br />E1 All welding procedures and methods shall be consL~ent with the <br />governing spech'ications or codes although Contractor may select the <br />procedure or method from available options. <br /> <br />E2 Examination of the welded joints will be made as the work <br />progresses in accordance with the applicable code m' specification <br />although Contractor may select the method of examination from <br />available options. <br /> <br />E3 Welding procedures and welding operators will be qualified in <br />accordance with Section IX of the Code of the American Society of <br />Mechanical Engineers. <br /> <br />Section F-PAINTING, COATING, LINING, <br /> OR INSULATING <br /> <br />FI Painting, coatings, linings or insulation are included only when <br />specified in the proposal. <br /> <br />F2 If weather conditions are unsuitable for application of paints, <br />coatings, linings or insulation at the time the Structure has been <br />completed and satisfactorily tested, the Structure shall be accepted by <br />Purchaser as complete without such painting, coaling, lining or <br />insulating, subject to the retention by the Purchaser of a reasonable <br />sum from the contract price to cover the cost of painting, coating, lining <br />or insulating until such time as Contractor complete the painting, <br />coating, lining, or insulating. <br /> <br />Pdnted in USA <br /> <br />F3 If shop ~ paints, coatings, linings or insulation are supplied <br />by Contractor and finish applications are not included in Contractor's <br />field erection Ix~ion of the proposal, then any cleaning, patching or re- <br />application of paints, coatings, linings or insulation along the field <br />erected joints, and any other areas, are not included in the work of <br />Contractor. <br /> Section G - TESTING <br /> <br />G1 This section relates to testing in accordance with the governing <br />specifications ~ applicable codes. If no test is required, this section <br />shall not apply. <br /> <br />G2 If the structure and foundations have been designed for a <br />hydrostatic test load, the structure shall be tested by filling it with water <br />immediately upon completion. In other cases, test methods as <br />described in the proposal or as may be agreed upon between <br />Purchaser and Contractor shall be followed. <br /> <br />G3 VV~en hydrostatic test is required, Purchaser shall promptly furnish <br />all required pipe, hose and titlings, make all connections, fill with <br />sufficfient water aad dispose of water upon completion of test, all without <br />cost to Con~or. The Purchaser shall be responsible for .any <br />corrosion or ar~' ether attack caused by their test water. Contractor will <br />furnish the proper test gauges and will apply a required test pressure to <br />pressure vessels. <br /> <br />G4 If water is net available for testing, the structures shall be tested by <br />tightness by means of a vacuum box tester, a penetrating oil test, or <br />such other test method as may be agreed upon between Purchaser and <br />Contractor. The cost of such alternative testing will be for Purchaser's <br />accounL <br /> <br />G5 For pressme vessels, Purchaser shall provide test water at a <br />temperature no{lower than 60°F. <br /> <br />G6 Any interconnected construction, piping, or equipment not <br />furnished by Co~tractor shall be disconnected from the structure by <br />Purchaser pdort~ tesL <br /> <br />G7 While the structure is undergoing test, Purchaser shall abide by <br />and help enfome any safety precaution deemed by Contractor to be <br />necessary forum safe conduct of any required test. <br /> <br />Section H - DELAYS <br /> <br />H1 Any period of delay attributable to causes beyond the reasonable <br />control of Conlractor shall be added to the time for the completion of the <br />structure irrespective of whether such causes are operative at the time <br />of making the contract or at a subsequent time or times. Such causes <br />shall include, but shall net be limited to, the failure or default of <br />Purchaser or any subcontractor or supplier to furnish equipment or <br />material or to do work as agreed upon with Contractor, failure or delay <br />on the part of Purchaser to provide satisfactory financial information <br />when requested, failure of any common carrier to transport matedal for <br />said work according to the prevailing schedule of transportation in effect <br />at the date of the contract, action or inaction of any governmental <br />agency having or claiming jurisdiction, stdke or lockout of workers, <br />acc~denL war, action of mobs or public enemy, any act of lawlessness <br />interrupting the work or destroying or injuring the material therefor, act <br />of God, and inclement weather. <br /> <br />H2 ~,11 cost i~cluding overheads, general and administrative <br />allowances piss a reasonable profit thereon incurred by Contractor on <br />account of de~ay or interruption of its work by act or inaction of <br />governmental or regulatory agency or act or omission on part of <br />Purchaser or any party acting for or on behalf of Purchaser, including <br />but not limited to delay caused by failure to furnish accessories, <br />foundations, test equipment, test water, utilities, components or <br />materials at or before the time when required, will be for the account of <br />Purchaser. <br /> <br />H3 Contractm shall not be liable for consequential loss of revenue or <br />loss of profit or other remote or indirect loss resulting form any delay. <br /> <br />NAC 115 (Page :2 of 4) Rev_S~.l~9_ <br /> <br /> <br />