My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/11/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 09/11/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:27:15 PM
Creation date
9/4/2003 2:47:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/11/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/02/2001 14:11 FAX 7634752429 SRF CONSULTING GROUP~ <br /> ............ ~0o~ <br /> <br /> ~ C.ONSULTING GROuP, INC. <br /> <br />Transportation · Civil · Structural · Environmental · Planning · Traffic · Landscape Architecture · Parking <br /> <br /> I <br />I <br /> I <br /> <br />TO: <br /> <br />Mr. Brian Olson, P.E.. <br />City Engineer <br />CrrY oF RAMSE¥ <br /> <br />ADDENDUM <br /> <br />SKF No. 0014209 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />. Patrick Corkle, P.E., Associate <br /> Cormey Weber, Engineer <br /> <br /> August 2, 2001 <br /> <br />ADDENDUM TO. THE CENTEX <br />STUDY DATED JULY 12, 2001 <br /> <br />ADDmON RESIDENTIAL DEVELO?IV~q,~ TRAF~C <br /> <br />I <br />I <br />I <br />I <br /> <br />Daily Traffic Volumes <br /> <br />In response to the Citfs concems.with the previously proposed site plan included in the July 12: <br />2001 draft memorandum,, a new site plan was developed (see Figure 1). Similar to the previous <br />site plan, six access points are proposed for the development. -Based on the proposed roadway <br />network, directional distribution and travel time estimates, it is expected that the two main access <br />points to/from the proposed development include Yakima Street and Xkimo Street at 153rd <br />Avenue. Approximately $0 percent of the development trips will be distributed amongst these <br />two access locations. Table 1 displays the number of'daily trips expected to use each of the six <br />access points under year 2006 full build conditions. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 <br />Expected Daily Traffic Volumes at Each Access Location <br />Access Provided at Ute Street <br /> <br />Access Location Daily Trips <br />Yakima Street at 156th Lane 110 <br />Waco Street at J.uniPer Ridge DdYe 30 <br />155th Lane at Barium Street .- 40 <br />Yakima Street at 153rd Avenue 630 <br />Xkimo Street at 153rd Avenue 600 <br />Ute Street at 153rd Avenue. 1.40 <br /> <br /> One Carlson Parkway North, Suite 150, Mirmeapolis,.MN 55447-4443 <br />Telephone (763) 475-0010 · Fax (763) 475-2429 · http://www, srfconsulting, com <br /> <br />An Equal Opportunity Employer ' -151- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.