My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 01/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:59:41 AM
Creation date
1/13/2011 4:39:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tim Himmer <br />From: Leo Offerman [ Leo .Offerman @connexusenergy,com] <br />Sent: Wednesday, December 29, 2010 2:11 PM <br />To: Tim Himmer; Steve Jankowski <br />Cc: Jennifer Sweeney <br />Subject: RE: Priority Street Lights <br />Follow Up Flag: Follow up <br />Flag Status: Flagged <br />Categories: Green Category <br />The following is the proposal for Zeolite and Town Center Drive: <br />From: Leo Offerman <br />To; 'Steve Jankowski' <br />Cc: <br />Subject: RE: Request for Proposal for Street Lights in RTC aka (The COR) <br />Steve, l received the current pricing from the manufacturers and the cost to instal( these 2lights is as follows: <br />The light ON Zeolite at the North side of bunker Will cost $5,200.00, (there will be 500 of conduit, wire and a base to <br />The light at Town Center Drive at the North Side of Bunkerwitl cost $2,425.00 (there is a Light pole base and wiire attl <br />Alit need is your approval to proceed and we will work to get the wire and base installed at Zeolite before frost. The <br />poles will be 6 -8 weeks out for delivery but they can be placed on the bases after freeze up. <br />Please let nee know as soon as possible so we can begin. <br />From: Steve Jankowski l inailto :SJankoowski©ci.rarnsey.mn.usl <br />Sent: Monday, November 01, 2010 1 :07 PM <br />To: Leo Offerman <br />Cc: Tim Himmer <br />Subject: Request for Proposal for Street Lights in RTC aka (The COR) <br />Leo, can you prepare a proposal for the installation of street lights, consistent with RTC standards for the attached tint <br />locations. Are the proper poles available for installation before winter sets in? <br />250W HPS Shoebox lights (similar to the lights on Sunwood east of Ramsey Blvd @ Basalt and Azurite would be <br />approximately $2300 to $2700 each depending <br />on the wire footage required after we reconstruct our line for the road reconstruction. <br />Krypton, Iodine, and Germanium intersections with Bunker are served by Anoka Municipal Utilities. <br />Please let me know how we should proceed with these new lights. <br />Leo Offerman <br />Sent: Fri <br />
The URL can be used to link to this page
Your browser does not support the video tag.