Laserfiche WebLink
Councilmember <br /> <br />introduced the following resolution and moved for its adoption: <br /> <br />RESOLUTION #01-08- <br /> <br />A RESOLUTION APPROVING THE ISSUANCE OF A CONDITIONAL USE PERMIT <br />FOR THE INSTALLATION AND OPERATION OF A CELLULAR ANTENNA <br />SYSTEM ON CITY OWNED PROPERTY AND DECLARING TERMS OF SAME <br /> <br /> WHEREAS, Verizon Wireless has properly applied for a conditional use permit to install <br />and operate a cellular antenna system on the City Water Tower #2 on City owned property <br />legally described as follows: <br /> <br />I <br />I <br />I <br />! <br />I <br /> <br />Outlot B, AEC ENERGY PARK, ANOKA COUNTY, MINNESOTA <br />("Site") <br /> <br /> WHEREAS, the Planning Commission met on August 7, 2001, conducted the public <br />hearing and recommended City Council approval of the request. <br /> <br /> NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE <br />CITY OF RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br /> <br />1. Based on Findings of Fact #~, a conditional use permit (Permit) for the installation <br /> and operation of a dellular antenna system located on the City Water Tower #2 on City <br /> owned property is hereby granted to Verizon Wireless, hereinafter referred to as <br /> "Permittee". <br /> <br />2. This Permit shall remain in effect until August 31, .~~long as the conditions <br /> imposed herein are complied with and so long as the Permittee, as Lessee has a valid <br /> Lease in place with the City as Lessor for lease of the necessary property on the City's <br /> water tower and related mezzanine area for the operation of its equipment on the site. <br /> However, the Permittee shall have the option for a maximum of four (4) 5-year renewals, <br /> resulting in a total permit period of up to twenty-five (25) years. The Permittee shall be <br /> responsible for submitting a written request for permit renewal at least 30 days prior to <br /> expiration of the permit. Said written request shall be submitted to City Council for <br /> review and Consideration ..... <br /> <br />3. All ce, l, rul~'r equipment structures will be located inside the water tower,4-2-ehe,m~tL'bzzanfne <br /> ~'-~~/C. on..st, ruction and construction methods of all equipment structures within the water <br /> tl tower shall be subject to the review and approval of the City Engineer. <br />4. The amount of sp3~ leas~ZuPon the mezzanine area will be }~ square feet~), 0'~/9 <br /> Upon termination of the Lease a~d this Permit, the City may order'"th~ removal of the <br /> antennae and related equipment upon ninety (90) days notice to the Permittee. Further, if <br /> there is an interruption of antenna operations for 12 consecutive months, the antenna and' <br /> related equipment shall be removed from the property. The Permittee shall provide the <br /> City with a letter of credit, performance bond, or another form of security that is <br /> acceptable to the City, in the amount of One Thousand Dollars and no cents ($1,000.00), <br /> to insure timely removal of the antennae and any related equipment. In the event the <br /> antermae and related equipment are not removed in accordance with the City's <br /> <br />-172- <br /> <br />I <br /> <br />I <br /># <br />I <br /> <br />I <br />I <br />I <br />! <br />I <br /> <br /> <br />