Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />REPORT FROM PUBLIC WORKS <br /> <br />Background: <br /> <br />The public works committee met on Tuesday, September 18, 2001 and discussed the <br />following two cases: <br /> <br />Emergency Vehicle Access into Construction Sites. <br /> <br />The City currently does not have any policy to control the sequencing of new <br />developments. Consequently, it is possible for construction actively to occur in locations <br />where it may be difficult to access with emergency vehicles. It was the recommendation <br />for the committee that a policy be developed, which would require that a class 5 driving <br />surface be within 300 feet of any building under construction, and that bituminous <br />pavement be required prior to the issuance of a certificate of occupancy.. ~ ~ . <br />Action: ~.-O' ~ ~ <br />Motion by Council to ratify the recommendation of the Committee. ~/ <br /> <br />I <br />1 <br /> <br />Mailbox Replacement Policy: <br /> <br />The City's current written policy specifies only that mailboxes, which are physically <br />struck by plows, will be replaced by the City. A new policy was discussed. The <br />Committee recommended that the policy be modified as follows: <br /> <br />l <br />I <br />I <br />I <br />i <br />I <br /> <br /> Mailboxes which are physically struck by City snow removal equipment will be <br /> temporarily replaced by the City within 48 hours of received notification. <br /> <br /> Tw~h Cai:lYa~l~r~e~o.a~e~/~cYkr, ePwl~i~:,tohre sdi~v~gme~i~b ~ixlbn~;utnh~e~°lol2 aWi~-~nScPhribn; <br /> ili21hu tor~Z~anent replacement above residents ma' ' y rectums a -' $75 <br /> allowance if they choose to replace the mailbox structure themselves and relieve <br /> the City of further obligation. <br /> <br />Action- <br /> <br />Motion by Council to ratify the recommendation of the Committee. <br /> <br />CC: 10/09/01 <br /> <br />I <br /> <br />I <br /> <br />-199- <br /> <br /> <br />