Laserfiche WebLink
I <br />I <br />I <br /> <br />2 <br /> <br />5 <br /> <br />8 <br /> <br />I11 <br />12 <br /> <br />BID SCHEDULE A - Watermain <br /> <br />Connect to Existing Watermain LS <br />Furnish and install 120' of 16" Ouctile [ton Watermain LF <br />Salvage and Reinstall Existing Hydrant With Auxiliary Va( LS <br /> <br />4 Furnish & Install One 16" x 16" Cut-in Tee EA <br /> Furnish & Install One 16" x 6" Tee EA <br /> Furnish & Install One 16" Buttery Valve EA <br />7 Furnish & Install One 45 Degree 16" Ductile Iron Bend EA <br /> <br /> Furnish & Install 8612 Concrete Curb & Gutter LF <br /> Furnish & Install One Cross Gutter per STR-2 EA <br /> <br />10 Remove Concrete Curb & Gu~ter LF <br />Furnish & Install Bituminous Wear Course - 2341A TN <br />Furnish & Install Class 5 Aggregate Base TN <br /> <br />13 Furnish & Install Complete Hydrant 'Added on in FieldEA <br /> <br />I a <br /> <br />I2 <br /> <br />TOTAL BID SCHEDULE A - Watermain <br /> <br />1.00 1,925.00 1,925.00 1.00 1,925.00 <br />120.00 55.00 6,600.00 116.00 $,380.00 <br />1.00 935.00 935,00 0.00 <br />1.00 5,500.00 5,500.00 1.00 5,500.00 <br />1.00 525.00 525.00 O. nO <br />1.00 1,760.00 1.760.00 2.00 3,520.00 <br />1.00 475.00 475.00 1.00 475.00 <br />260.00 20,25 5,265.00 346.00 7,006.50 <br />1.00 1,760.00 1,760.00 1.00 1,760.00 <br />50.00 11.00 550.00 122.00 1,342.00 <br />55.00 73.00 4,015.00 52.49 3,831.77 <br />140.00 16.25 2,275.00 124.18 2,017,93 <br />1.00 2,350.00 2,350.00 1.00 2,350.00 <br /> <br />BID SCHEDULE 8 - Supplementary Bid <br /> <br />33,935.00 36,108.20 <br /> <br />Furnish & InstaJl 8" Bituminous Trail - With Base & PavemLF <br /> <br />Furnish & Install Five Pedestrian Ramps Per STR-3 EA <br /> <br />b TOTAL BID SCHEDULE B - Supplementary Bid <br /> <br />2,200.00 10.25 22,550.00 2,870.00 29,417.50 <br />5.00 385,00 1,925.00 5.00 1,925.00 <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> I <br /> <br />24,475.00 31,342.50 <br /> <br />SUMMARY <br /> <br />TOTAL BID SCHEDULE A ~ Watermain <br />TOTAL BID SCHEDULE 8 - Supplementary 8id <br /> <br />33,935.00 36,108.20 <br />24,475.00 31,342.50 <br /> <br />TOTAL <br /> <br />58,410.00 67,450.70 <br /> <br />Page 3 of 3 <br /> <br />-117- <br /> <br /> <br />