My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 10/23/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:28:55 PM
Creation date
9/4/2003 3:22:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> City Engineer Olson stated that Wellhouse No. 3 is proposed to. be constructed <br /> 1,000 feet due south of Well No. 4 in the City's western well field located in Section <br /> and Specifications have been prepared by Bolton & Menk, Inc. and bids <br /> Wednesday, September 19, 2001. Bids were received from five contractors from <br /> $437,600 to $524,000. Rice Lake Construction Group provided the low in <br /> the 2001 Capital Improvements Program is an item to install a g, to <br /> retain power though periods of power outages and provide cost savin <br /> during periods of high-energy demands. The generator was bid as <br /> and ranged from $82,000 to $100,000. The bid from Rick <br /> generator was $100,000. If the alternate bid for the generators <br /> the low bid was provided by Magney Construction, Inc. <br /> necessary experience to successfully complete the <br /> bid as part of this process. The alternate identified as <br /> addition of face brick. The face brick is typical <br /> building a more decorative look. Due to the pumphouse <br /> Center area, staff recommended leaving the alternate out of' <br /> more generic look until the architecture of the area is defined <br /> installing the generator during the construction of the wellhouse <br /> wellhouse there is also a Supervisor, <br /> installed. SCADA is a system <br /> of the system. If a power outa~;~"i~'~buntered. <br /> on thereby ensuring continuous ~ <br /> of the generator under the same <br /> release of final payment. As a part of thil <br /> of supplying an akemate to the <br /> ranged from $20;000' ~t0':~ $40,000 with <br /> Automatic sy~e~'s instead:'~me SCADA <br /> <br /> City ~tt°mcy. Good,ch sta~'i:~hat the City a contract to bfi~ty Builders per the 2000 <br /> b~d process:-In~'~ty at that time,as the '~ Because of the year plus delay in giving <br />a Notice to Prd&ed .to:!~nfihi¢:'~:~b~ City's inabilitv to obtain access tn <br />stalI ~elt zt prudent:tO reb~d the project in 2001. City staff now recommended terminating the <br />~'(~n/ract with Infinityf~;,~nity is willing to do this in return for a $2%000 payment representing <br />"'>i~"GUt2°f~-pocket expenses :and,sdme lost profit as a result of its not performing the contract. The <br />delay in the: Notice to proceed h~d the City's rebidding has angered both Infinity and the 2001 <br />bidders, eaci~i.~,~plainingihat they are not being treated fairly and threatening to sue the City for <br />various reasons/~Infinity'is entitled to increase the original contract price because of the delay. <br />Staff has carefully analyzed the "bottom line" cost of either accepting the lowest responsible <br />2001 bid and settling with Infinity or rejecting all of the 2001 bids and performing under the <br />Infinity contr~( Staff concluded that the best interests of the City will to be to accept the lowest <br />2001 bid and': settle with Infinity and terminate its contract. The recommendation was made with <br />the following factors in mind: <br /> <br /> City <br /> the base <br /> for <br /> ~ as it Was last year, <br /> ion, Inc. has the <br /> alternate was <br /> resolution is for the <br /> and gives the <br /> possible Town <br />giving the pumphouse a <br /> There is a benefit to <br /> )n of <br /> that will be <br /> to the operation <br /> the generator to turn <br /> ~. The installation <br /> <br /> the system work prior to <br /> ~;gave the Contractors the option <br /> specified~ The deducts that were offered <br />sUpplying a deduct of $40,000 for using <br /> specified. <br /> <br />City Council/October 9, 2001 <br /> Page 7 of 24 <br /> <br />-53- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.