My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/25/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 01/25/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:34:50 PM
Creation date
1/20/2011 6:14:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Data in Year 2011 <br />Project # 11-STR-001 <br />Project Name Alpine Dr & Sunfish Lake Blvd (CSAH) Intersection <br />Description <br />Department <br />Contact <br />Type <br />Useful Life <br />Category <br />Priority <br />Status <br />Total Project Cost: <br />Street Improvements <br />Unassigned <br />25 <br />Street Improvement <br />6-Planned <br />Active <br />$225,000 <br />The intersection of Alpine Dr and Sunfish Lake Blvd is proposed to be <br />mproved through a j oint effort with Anoka County. <br />Improvements include the lowering the grades through the intersection for improved sight lines, installation of concrete curb & gutter, utility & <br />drainage improvements, reconstruction & widening of bituminous trails, replacement of the existing 4-way stop condition with a traffic signal, <br />addition of dedicated turn lanes, and concrete medians to channelize the turning movements and create separation at the approach to the <br />intersection. <br />Justification <br />This project received funding from the Federal Highway Administration (FHWA) Highway Safety Improvement Program (HSIP). Due to an <br />accident history in the past long term safety improvements are proposed, which would also improve the capacity and traffic circulation through this <br />intersection. Total project costs are estimated at $1.6M, of which Federal & County cost participation is included <br />Expenditures 2011 2012 2013 2014 2015 Total <br />Improvements Other than Build 225,000 225,000 <br />Total <br />225,000 <br />225,000 <br />Funding Sources 2011 2012 2013 2014 2015 Total <br />MSA 120,000 120,000 <br />Water Utility Fund 105,000 105,000 <br />Total <br />225,000 225,000 <br />Revised 12/2010 <br />Page 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.