My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/18/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 12/18/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:30:59 PM
Creation date
9/5/2003 9:49:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/18/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-21 O- <br /> <br />11. Stage II Improvements Required. The Stage II Improvements which the CITY requires <br /> the DEVELOPER to construct within the Plat are as follows: <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br /> <br />g) <br /> <br />Street striping and signing <br />Traffic signing <br />Street lights <br />Sealcoating <br />Adjusting water shut-off boxes <br />Maintenance of storm water and facilities <br />Boulevard seeding <br /> <br />(" Stage II Improvements") <br /> <br />12. <br /> <br />Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br />Improvements. The DEVELOPER shall also deposit an amount that is determined by the <br />CITY to be adequate to aid in the operation and maintenance of street lights in locations <br />within the Plat determined by the City Engineer and installed by Connexus for the first three <br />(3) years after final plat approval. The CITY will bill residents in the Plat at least quarterly <br />for street light maintenance and operation costs; billing will be initiated at the time a <br />residence connects to municipal water and sanitary sewer. The DEVELOPER will pay to <br />the CITY an amount equal to 100% of the City Engineer's estimated construction cost of the <br />items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br />is: <br /> <br />a) <br /> <br />c) <br />d) <br />e) <br /> <br />g) <br />h) <br /> <br />Street striping and signing $0 <br />Traffic signing (2 65120 each) $240 <br />Street lights (3 ~ $1500 each) $4500 <br />Street light maintenance & operation for (3 years 3 ~$270)$810 <br /> <br />Sealcoating (3,000 sq. yd. at 75/sq. yd.) <br />Adjusting water shut-off boxes <br />Maintenance of storm water and facilities <br />Boulevard seeding <br /> TOTAL <br /> <br />$2250 <br />No charge <br />No Charge <br />No Charge <br />$7,8O0 <br /> <br />13. <br /> <br />Hard Surfaced Driveways. Hard surfaced driveways are a requirement for each lot in the <br />Plat. Said improvement shall be installed by the building permit applicant or the homeowner <br />at the time the Certificate of Occupancy is issued or as soon thereafter as possible, weather <br />permitting. In the event this improvement is not timely installed on.a lot, the DEVELOPER <br />and/or the DEVELOPER'S assign(s), agrees that the CITY may install said improvement <br />on the lot and specially assess the cost therefore against the lot. The DEVELOPER hereby <br />waives all right to a public hearing and other statutory rights or City Charter rights granted a <br />property owner relating to special assessments, including the right to appeal the special <br />assessment for installation of the hard surfaced driveway. In addition, the DEVELOPER <br />grants the CITY a license to enter on each lot of the Plat in order to install the improvement <br />described in this paragraph if the same has not been previously constructed. <br /> <br /> I <br /> I: <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.