My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/18/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 12/18/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:30:59 PM
Creation date
9/5/2003 9:49:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/18/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />,I <br /> <br /> . ADOPT RESOLUTION SUPPORTING THE <br />TH 10 INTERREGIONAL CORRIDOR MANAGEMENT PLAN <br />By: James E. Norman, City Administrator <br /> <br />CASE # <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Background: <br /> <br />The Minnesota Department of Transportation (MnDOT) began a TH 10 hnterregional Corridor <br />Management Plan for TH 10. The Plan is intended to cover the TH 10 from 1-35W on the east <br />side to TH 24 in Clear Lake on the west, and involves participation with MnDOT District 3 and <br />the Metro Division. The purpose of the Plan has been to .develop a common vision in <br />management approach in order to preserve and improve TH 10's ability to serve as an important <br />statewide connection for Minnesota in the future. MnDOT has utilized the services of Howard <br />R. Green Company to perform the study. <br /> <br />The City Council received a presentation by Howard R. Green Company during the Public <br />Works Committee meeting of November 20, 2001. The study showed two separate options for <br />the City ofl~amsey for TH 10. The options included the possibility of an expressway that would <br />eventually be converted to a freeway or a freeway system. The freeway system could have three <br />alignments. The preferred alignment seemed to be the northernmost alignment that is <br />immediately adjacent to the BNSF Rail system. During the November 29, 2001, joint meeting of <br />the Policy Advisory Committee and Technical Advisory Committee of the TH 10 Interregional <br />Corridor Study, MnDOT officials recommended that each City along the corridor adopt <br />resolutions in support of the process. Subsequently, MnDOT staff met with City staff and <br />framed a resolution in support for the Management Plan that included support of a freeway <br />system and included a preference for the Northernmost alignment of a freeway system <br />(resolution attached). If Council desires to formally go on record supporting the TH 10 <br />Interregional Corridor Management Plan, they would adopt the resolution as presented. <br /> <br />Council Action: <br /> <br />Motion to adopt Resolution #01-12-XXX accepting, supporting, and adopting the TH 10 <br />Interregional Corridor Management Plan. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Community Development Director <br />Principal Planner <br />City Engineer <br />City Attorney <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.