My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 02/08/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:56:06 PM
Creation date
2/4/2011 10:25:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Date: 02/08/2011 <br />By: Tim Himmer <br />Engineering/Public Works <br />Information <br />Title: <br />Consider award of contract for City project 10 -24; wetland 656W outlet <br />Item #: 7. 2. <br />Background: <br />In an effort to provide flood protection and to improve overall drainage through the watershed, the City has <br />identified a ditch project known as the 656W Wetland Outlet Project. This project (as illustrated on the enclosed <br />aerial photograph) would create an outlet for wetland 656W, the large wetland complex south of Alpine Drive and <br />east of Ramsey Blvd., through the construction of approximately 3000 feet of drainage ditch and /or culvert <br />installation. <br />The need for this project was identified in the early to mid 1990's, and a drainage easement plat was prepared in <br />1995 to facilitate the acquisition of the necessary easements. Most of the easements were acquired at that time, but <br />the project was not advanced because the drainage from this ditch was to flow into County Ditch #3166, which was <br />seriously clogged. The City restored County Ditch #3166 to its original cross section in 2006 and it is now feasible <br />to pursue the 656W outlet project. <br />While the original intent of this project was to create a dedicated drainage way from the wetland complex to the <br />Rum River, a secondary improvement was identified to diminish the concern for localized flooding in the area north <br />of 156th Avenue in an effort to direct runoff into wetland 656W. All required easements to complete the original <br />scope of the project have now been acquired, as approved by Council on October 26, 2010. This project is being <br />undertaken in the winter due to the nature of the work being performed to take advantage of frozen soil conditions <br />for improved access, erosion control, and minimal disruption to the environment. <br />Field work for the project has been completed, and meetings have been held with contractors that are going to <br />prepare proposals for implementation. Formal proposals will be received on Friday, February 4th and forwarded <br />for Council via e -mail for consideration. <br />Recommendation: <br />Staff recommends award of contract to XXX in the amount of XXX for City project 10 -24; wetland 656W outlet. <br />Funding Source: <br />Funding for this project will be from the City Storm Water Utility and there will no assessment to property owners. <br />Council Action: <br />Motion to award a contract to XXX in the amount of XXX for City project 10 -24; wetland 656W outlet. <br />Proiect aerial <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 02/02/2011 01:15 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.