PW CASE # 3 <br /> <br />UPDATE ON TRUNK HIGHWAY #47/COMMUNITY ROADSIDE PARTNERSHIP <br />PROGRAM FOR LANDSCAPE PLANTINGS <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />The purpose of this case is intended to provide a brief update on the status of the Trunk Highway <br />#47 project. The issues still outstanding include: <br /> <br />The construction of the sound wall. <br />The signalization or the restrictions of tums at 142nd Avenue N.W. <br />The completion of the landscaping. <br /> <br />Sottltd wall construction. The construction of the sound wall was to be initiated during the first <br />week of January, however, the severe December weather has caused the construction to be <br />rescheduled. It is anticipated that we will have a revised schedule prior to the Public Works <br />meeting. A Supplemental agreement for this work is still being prepared at MnDot. The price for <br />the wall construction by the contractor must be reviewed by MnDot to assure reasonableness. <br />However, it is currently estimated that the cost of the wall will be $211,000 with the City's <br />participation being $69,400. The City's share will be provided from either MSA or T~ funding. <br /> <br />The signalization or the restrictions of turns at 142"a Avenue N.W. The current direction from <br />the City Council regarding the intersection of 142"d Avenue N.W. and Trunk Highway #47 is that <br />the first preference is that it be signalized. However, in the event that the intersection doesn't <br />meet warrants for signalization, it is City Council's de ire that concrete medians being installed <br />that would allow left tums from Trunk Highway #47, but would prohibit left tums from 142nd <br />Avenue N.W. onto Trunk Highway #47. <br /> <br />Now that the other signals have been installed and are functioning for about six weeks it would <br />be appropriate to conduct an intersection study and prepare a new signal justification report for <br />142"d Avenue N.W. Unless directed otherwise, staff will arrange for the necessary work to be <br />performed. <br /> <br />The completion of the landscaping. The original plans provided for the planting of 188 trees <br />along Trunk Highway #47 and Sunwood Drive/ Because of project changes which included <br />adding a sound wall on Trunk Highway #47 and a sidewalk on the north side of Sunwood Drive <br />the landscape plan had to be revised. Installation will be preformed in the spring, The plan now <br />calls for planting 103 trees along Trunk Highway #47 which will be placed between the sound <br />wall and the trail. The revised plan also calls for the planting of 144 tress along Sunwood Drive <br />and the detention pond on the northwest comer of Sunwood Drive and Trunk Highway #47. <br /> <br />The present plan anticipates placing sod in the wide areas of the median (4.8 meter or 15.7 feet). <br />Staff has been meeting with Ms. Patti Stromeyer of MnDot who has provided information on the <br />Community Roadside' Landscaping Partnership Program. Although it would take some minor <br />modifications of the grading and drainage system, it would be possible to consider some more <br /> <br /> <br />