Laserfiche WebLink
Estimated Cost of Construction of Trunk Sanitary Sewer to Western <br /> Boundary of the City of Ramsey <br /> <br />September 25, 2000 <br /> <br />Diameter and Linear Footage of Trunk Sanitary Sewer Pipe <br /> <br />27" - (0,3 + 0.23) + 0.53 mi. X 5280 = 2800 L.F. <br /> <br />24" - (0.16 + 0.62): 0.78 mi. X 5280: 4200 L.F. <br /> <br />18" - (0.85) -- 0.85 X 5280 -- 4500 L.F. <br /> <br />15" - (0.315 + 0.28 + 0.1 + 0.2 + 0.125 + 0.27): 1.29 X 5280 -- 6900 L.F. <br />8" ~ (.175): 0.175 X 5280: 1000 L.F. <br /> <br /> Cost of Construction <br /> <br />From costs published in 199I Comprehensive Sewer Plan adjusted with the following conditions (5% <br />over 9 yearx) <br /> <br />27" - (F/P, 5%, 9) $116 = 1.5513 (116) = $180 / L.F. X 2800 = $504,000 <br /> <br />24"-. (F/P, 5%, 9) $110 = 1.5513 (110) = $1'70 / L.F. X 4200 -- $714,000 <br /> <br />18" - (F/P, 5%, 9) $91 = 1.5513 (91) = $141 / L.F. X 4500= $634,500 <br /> <br />15"- (F/P, 5%, 9) $54 = 1.5513 (54) -- $84 / L.F. X 6900 -- $579,600 <br /> <br />12"-(F/P, 5%, 9) $43 = 1.5513 (43) - $66 / L.F. X 2600 = $171,600 <br /> <br />8"- (F/P, 5%, 9) $35 = 1.5513 (35)= $54 / L.F. X 1000 -- $54,000 <br /> <br />TOTAL: $2,657,700 <br /> <br />29 <br /> <br /> <br />