Laserfiche WebLink
FEASIBILITY STUDY <br /> OPTION 1 EXHIBIT D <br /> City of Ramsey <br />Improvement Project No. 02-21 <br />151st Ave./Fluorine St. 152nd Ave. <br />Streets,Water Sewer <br /> <br />7/28/2003 <br /> <br />Bid Schedule "B" - Storm Drainage <br /> <br /> Estimated <br />Item Number of <br />No. Description Units Unit Unit Cost Estimated Cost <br />27 Common Excavation(Detention Basin) 1,500 CY $4.00 $6,000.00 <br />28 Seeding- Type Lawn Restoration 0.75 ACRE $3,000.00 $2,250.00 <br />29 Seeding Mixture 4 60B . . 100 LBS $4.75 $475.00 <br />30 Commercial Fertilizer, 10-10-10 500 LBS $0.50 $250.00 <br />31 Hydraulic Soil'Stabilizer Type 5 2 TON $350.00 $700.00 <br />32 Tree Clearing Individual Trees > 4" 20 EACH $300.00 $6,000.00 <br />33 12"RCP Class III 440 LF $22.00 $9,680.00 <br />34 15"RCP Class III 400 LF $24.00 $9,600.00 <br /> <br />35 18"RCP Class Ill . 180 LF $30.00 $5,400.00 <br /> <br />36 24"RCP Class III "~ 300 LF $45.00 $13,500.00 <br /> <br />37 30"RCP Class 111 330 LF $60.00 I $I9,800.00 <br /> <br />38 1.~"RCP FES 1 EACH $500.00 $500.00 <br />39 18"RCP FES 1 EACH $900.00 $900.00 <br />~0 30"RCP FES 1 EACH $750.00 $750.00 <br />41 Rip Rap CIass III I 10 CY $75.00 $750.00 <br /> <br /> 42 Outlet Control Structur~ I 1 EACH $2,000.00 ' $2,000.00 <br />43 MH/CS Storm Drainage._Structuret 13 EACH ,$1,200.00 $15,600.00 <br /> <br />Total - Bid Schedule "B" <br /> <br />$94,155 <br /> <br />--224¢Ha011Shared Oocslmunicipallaotsegol3471RA633 feasibility-table 1.xls <br /> <br />Page 4 <br /> <br />7/28/2003 <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> <br /> <br />