My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:52:30 PM
Creation date
9/5/2003 12:48:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br /> OPTION 2 EXHIBIT D <br /> City of Ramsey <br />Improvement Project No. 02-21 <br />151st Ave,/Fluorine St, 152nd Ave. <br />Sti'eets,Water Sewer <br /> <br />7~28~2oo3 <br /> <br />Bid Schedule "B" - Storm Drainage <br /> <br /> Estimated <br />Item Number of <br />No. Description Units Unit Unit Cost Estimated Cost <br />27 Common Excava~on(Detention Basin) 1,500 CY $4.00 $6,000.00 <br />"'28 Sodding-Type Lawn Restoration 6,600 SY $3.50 $23,100.00 <br />29 Seeding - Type _Lawn Restoration 0.75 A~RE $3,000.00 $2,250.00 <br />30 Seeding Mixture - 60B 100 LBS. $4.75 $475.00 <br /> <br />31 Commercial Fertilizer, :l'~-10q0 500 LBS $0.50 $25~.00 <br />32 HydrauLic Soil Stabilizer Type 5 2 TON $350.00 $700.00 <br />33 Tree Clearing Individual Trees > ~," 20 EACH $300.00 $6,000.00 .... <br />2'4 12"RCP Class Ill- 1,'~0 LF $22.00 $25,520.00 <br />35 15"RCP Class III 210 LF $24.00 $5,040.00 <br />36 18"RCP Class Ill 60 LF $30.00 $1,800.00 <br />37 24';R~5 Class 111 160 LF $45.0'0 $7,200.00 <br />38 30"RCP ClaSs Ail" 33(~ ' LF $60.00 $19,800.00 <br />39 12" RCP ~ES 37 EACH $350.00 $12,950.00 <br />40 15': RCP FES 5 -~ACH $500.00 $2,500,00 <br /> <br />41 18"RCP FES 3 '" EACH I $600.~)0 $1,80(~.00 <br />42 24"RCF; FES' ' 9 " EACHI $750.00 $6,750".00 <br />43 30"RCP FES ' 1 EACH $900.00 I $900.00 <br /> 44 Rip Rap Class II1 10 CY. $75.00 $750.00 <br /> <br />45 Outlet Control Structure 1 EACH $2,000.00 $2,000.00 <br /> ;46 MH/CB Storm Or'~inage Structure 13 EACH $1,200.00 $15,600.00 <br /> <br />Total - Bid Schedule "B" <br /> <br />$141,385 <br /> <br />--228r~a01/Shared Docs/municipallaotsegoi3471RA633 feasibility-table 1.xls <br /> <br />Page 4 <br /> <br />7~28~2003 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.