My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:52:30 PM
Creation date
9/5/2003 12:48:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />valves, and any other underground facilities within the plat and to a <br />distance of 100 'feet beyond shall be shown. <br /> <br />Location and size of utility laterals and irrigation taps. The connection <br />to the City municipal water system must be constructed of ductile iron <br />piping with a gate valve in the street for operation. The size of irrigation <br />meters is subject to the approval of the City Engineer. <br /> <br />Revised in accordance with preliminary plat comments and staff review <br />letter. <br /> <br />Additional information as requested by the City and as required by the <br />Tree Preservation Ordinance. <br /> <br />Final Landscape Plan/Tree Preservation Plan <br /> <br />A final Landscape Plan/Tree Preservation P1an in accordance with Sub- <br />section 9.50.02, Subd. 2.e, revised in accordance with preliminary plat <br />comments'and staff review letter. <br /> <br /> All irrigation systems must have an approved backflow device <br />installed in the irrigation enclosure. Irrigation enclosure location and <br />construction materials are subject to the approval of the City Engineer. <br />Further, all new or updated systems must install a Rain Sensor device to <br />stop irrigation during rain events. <br /> <br />3. Additional- information as requested by the City. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />Final Construction Plans and Specifications <br /> <br /> Title page to include a vicinity map, as well as an index, and <br />certified by a professional engineer. <br /> <br />Traffic control and tabulation. <br /> <br />Construction details including a typical section. <br /> <br />Existing topography with miscellaneous removals. <br /> <br /> Sanitary sewer and water main plan and profile sheets with <br />plan scale not to exceed 1 inch equal to 50 feet and profile no greater <br />than 1 inch equal to 5 feet in vertical. <br /> <br /> Storm sewer construction plans with plan 1 inch equal to 50 <br />feet and profile no greater than 1 inch equal to 5 feet in vertical. <br /> <br />9.50 Subdivision Regulations <br /> <br />9-17 March 2003 Draft <br /> <br />-395- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.