My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/25/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 01/25/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:38:10 PM
Creation date
9/8/2003 9:33:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/25/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> <br />I <br />I <br />I <br /> <br />provide for reimbursement of all costs associated with such restoration. In the event permittee <br />elects not to perform restoration, City may, in lieu of performing the restoration itself, impose a <br />fee to fully compensate for the resultant degradation as well as for any and all additional City <br />Costs associated therewith. Such fee for degradation shall compensate the City for costs <br />associated with a decrease in the useful life of the fight-of-way caused by excavation and shall <br />include a restoration fee component. Payment of such fee does not relieve a permittee from any <br />restoration obligation. <br /> <br />mo <br /> <br />City Restoration. If the permittee chooses at the time of application for an <br />excavation permit to restore the right-of-way itself, such permittee shall post <br />an additional performance and restoration bond in an amount determined by <br />the City to be sufficient to cover the cost of restoring the right-of-way to its <br />pre-excavation condition. If, thirty-six (36) months after completion of the <br />restoration of the right-of-way, the City determines that the right-of-way has <br />been properly restored, the surety on the performance and restoration bond <br />posted pursuant to this Subd. 2 shall be released. <br /> <br />bo <br /> <br />Permittee Restoration. If the permittee chooses at the time of application <br />for an excavation permit to restore the right-of-w..?,y itself, such permittee <br />shall post an additional performance and restoration bond in an amoun~ <br />determined by the City to be sufficient to cover the cost of restoring the <br />right-of-way it is pre-excavation condition. If, thirty-six (36) months after <br />completion of the restoration of the right-of-way, the City determines tha'~ <br />the right-of-way has been properly restored, the surety on the performance <br />and restoration bond posted pursuant to this Subd. 2 shall be released. <br /> <br /> Subd. 3. The Permittee shall perform the work according to the standards <br />and with the materials specified by the City, The City shall have the attthority to prescribe ~he <br />manner and extent of the restoration, and may do so in written procedures of general application <br />or on a case-by-case basis. The City, in exercising this authority, shall be guided but not limited <br />by the following standards and considerations: <br /> <br />ao <br /> <br />The number, size, depth and duration of the excavation, disruptions or <br />damage to the right-of-way; <br /> <br />bo <br /> <br />The traffic volume carried by the right-of-way; the character of the <br />neighborhood surrounding the right-of-way; <br /> <br />Co <br /> <br />The pre-excavation condition of the right-of-way; the remaining life- <br />expectancy of the right-of-way affected by the excavation; <br /> <br />do <br /> <br />Whether the relative cost of the method of restoration to the permittee is in <br />reasonable balance with the prevention of an accelerated depreciation of the <br />right-of-way that would otherwise result from the excavation, disturbance or <br />damage, of the right-of-way; and <br /> <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.