My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/28/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 03/28/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:40:54 PM
Creation date
9/8/2003 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/28/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> <br />March 2, 2000 <br /> <br />Dennis Sharp <br />10907 9Ya Ave. N <br />Maple Grove, MN 55369 <br /> <br />Regarding: ACE Solid Waste Site Plan Review <br /> <br />Dear Mr. Sharp: <br /> <br />We are in re ceipt <br />Floor Plan (gheet <br />February 14, 2000. <br />(Sheet C 1) <br />comments: <br /> <br />PHONE: (612) 427-1410 FAX (612) 427-5543 <br /> TOD (612) 427-8591 <br /> <br />We are in receipt of the ACE Solid W~e Site Plan (Sheet Al), Landscape Plan (Sheet L1), <br />Floor Plan (Sheet A2) and Elevation Plan (Sheet A3) prepared by Lampert Architects dated <br /> We have also received the Grading and Drainage and Erosion Control Plan <br />(Sheet C1) dated February 11, 2000 prepared by Plowe Engineering. We offer the following <br /> <br />General: The plan proposes to construct an office building with a track terminal and a future <br />recycling transfer station. The site is generally located west of Azurite Street and North of <br />McKinley Street. <br /> <br />Zoning: The site is zoned Business Warehouse; the Site Plan submitted should be modified to <br />correctly reflect BW, Business Warehouse instead of I, Industrial. The Business Warehouse <br />district permits office buildings and transportation terminals. <br /> <br />Access: The site plan proposes to have four access points; two onto Azurite Street and two onto <br />McKinley Street. The access plan is acceptable. <br /> <br />Building Size: The office building is proposed to be 19,926 square feet in size, with a second <br />floor mezzanine area of 1,248 square feet. A recycling facility of 17,100 square feet in size is <br />shown on the site plan, but is being proposed for construction at a future date. <br /> <br />Lot Coverage: The site is approximately 8.94 acres or 378,616 square feet in size and City Code <br />restricts building coverage to 35 percent of a lot area or I32,516 square feet in this case. The size <br />of the proposed structure, including the future addition, is 37,026 square feet. <br /> <br />UtiIities: Sanitary sewer and municipal water are provided along both McKinley and Azurite <br />Streets. Service connections located behind the street curb are available on McKinley Street. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.