My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 04/25/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:42:28 PM
Creation date
9/8/2003 10:33:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chairperson Anderson closed the regular portion of the Planning Commission meeting at 6:03 <br />p.m. in order to conduct the public hearing. <br /> <br />Public Hearing <br /> <br />Chairman Anderson called the public hearing to order at 6:07 p.m. <br /> <br />P~'esentation <br /> <br />Community Development Director Frolik explained that Ace Solid Waste is proposing to <br />relocate their operation from Andover to Ramsey. The facility Will include one building to house <br />their offices and truck terminal, and a second building to be used as a transfer station for <br />'processing recyclables and mixed solid wastes. City Code requires a conditional use permit for <br />the transfer station part of their operation. Basically, the route tracks enter the transfer station <br />through one of four overhead doors and unload their materials onto the floor. The mixed solid <br />wastes are then loaded into open-top semi-trailers and recylcables are loaded into either open-top <br />or van trailers for transportation to final destinations. There is one lowered dock inside the <br />building for loading open-top trailers and there is one standard back-in dock for loading van <br />trailers. There are no mixed solid wastes left on the tipping floor overnight or over the weekend. <br />Any partial load remaining on the floor at the end of the work day is loaded into a semi-trailer <br />and the trailer remains parked inside the building overnight. The loading of the trailer to <br />capacity is completed the next day when incoming route tracks start arriving again. Recyclables <br />are stored in an area of the building separate from the mixed solid waste tipping floor. <br />Recyclables are stored on the floor in the building until they reach a full semi load capacity. At <br />that time, they are loaded onto the semi-trailers and shipped to their final destination. <br /> <br />Chairperson Anderson stated the Planning Commission reviewed and recommended approval of <br />the site plan for the office portion and truck terminal. <br /> <br />Community Development Director Frolik stated that is correct but that consideration did not <br />'include the conditional use permit (CUP) connected With it. She explained that consideration of <br />the office and truck terminal was postponed by the City Council so they can consider ail <br />requests at the same time. <br /> <br />Citizen Input <br /> <br />Roger Hanson, Bake Star Company, stated they produce automated bakery equipment and do not <br />need the problems they believe will arise from the proposed use such as mice, birds, and other <br />wild creatures that will interfere with their business of bakery equipment. He stated their <br />property is adjacent to this proposed site and presented a map identifying their property. Mr. <br />Hanson noted the letter he had submitted regarding their concerns with the propoSed use. <br /> <br />Chairperson Anderson noted the five letters of opposition and asked that they become part of the <br />official record as follows: <br /> <br />· Gregory J. Deal, NAU Companies, 6701 Highway I0 NW <br /> <br />Planning Commission/April 10, 2000 <br /> Page 2 of 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.