Laserfiche WebLink
612 concrete curb. The landscape plan is generally acceptable and meets minimum City <br />requirements. Staff has requested that the westerly truck entrance and west curb line be shifted <br />to the east so as to preserve the existing screening at the west property line. The applicant has <br />agreed to preserve the existing screening by shffiing the westerly truck entrance. The plan has a <br />good mix of native trees in various stages of maturity and is proposing a sufficient berm to <br />screen overnight truck parking. <br /> <br />Dennis Sharp, ACE Solid Waste, reviewed the rendering of the building. In regards to the staff <br />letter from March 2, 2000 requesting that the building move fiarther to the east, they would prefer <br />that the building stay as proposed to maximize off street parking spaceS. <br /> <br />Community Development Assistant Barnett stated that it was a suggestion of staff, but staff is <br />comfortable with the addition of the trees instead. <br /> <br />Mr. Sharp addressed the ponding issue and stated that they would prefer to have skimmers on <br />both ponds. <br /> <br />Motion by Commissioner Johnson, seconded by Commissioner Wivoda, to recommend that City <br />Council grant site plan approval to Ace Solid Waste contingent upon compliance with the City <br />Staff Review Letter dated March 2, 2000 andlandscape plan as proposed. <br /> <br />Motion Carried. Voting Yes: Chairperson Anderson, Commissioners Johnson, Wivoda, <br />Dempsey, and Kociscak. Voting No: None. Absent: Commissioners Jensen and Nixt.. <br /> <br />c~e/t13: Request for Site Plan Review; Case of Systematic Refri, <br /> <br />City Rasmussen stated that the City of Ramsey has re~ a request for site plan <br />review )royal' from Systematic Refrigeration for a generally located south of <br />Industry NW and north of the intersection of NW and Radium Street NW. <br />The proposed is 80,280 square feet' Building coverage is restricted to <br />35% of the lot area, is 99,856 square feet. plan also proposed a future expansion on <br /> <br />the property to the east <br />building constitutes 28% lot <br />requirements. The plan proposes <br />to be raked with a smooth <br />compliance with City <br />provides 111 spaces. <br /> <br /> office, and manufacturing space. The proposed <br /> )osed structure location complies with all setback <br /> precast concrete wall in gray color. The texture is <br /> ~and. The number of loading berths proposed is in <br /> uires 106 parking spaces. The proposed plan <br />with City e, all traveled surfaces of the site will be paved <br /> <br />with bituminous and with B-612 concrete The landscape plan meets the minimum <br />requirements., Stf4'~s suggesting that the landscape should show the trails relationship to <br />the Hackberry.~n the north side of the site and that the ~,,be alternated from one side of the <br />trail to the//6ther. The plan proposes to grade both the areaXf~ the Systematic Refrigeration <br />buildin.,g./and the vacant lot to the east which will ~tcc( :nmodat~tt e future expansion. The <br /> /'[ng and the paved area are graded to drain into a detention ponE, which will be constructed <br /> <br />Planning Commission/March 6, 2000 <br /> Page 23 of 25 <br /> <br /> 169 <br /> <br /> <br />