Laserfiche WebLink
I <br /> I. <br /> I <br />I <br /> <br /> 79736 <br /> <br />Applications for permits shall be made on State form "Application For <br />Utility Permit On Trunk Highway Right-Of-Way" (Form TP2525). <br /> <br />The City shall submit to the Minnesota Pollution Control Agency the <br />plans and specifications for the construction or reconstruction of <br />its sanitary sewer facilities to be performed under the construction <br />contract and obtain, pursuant to Minnesota Statutes Section 115.07 or <br />Minnesota Rules 7001.1030, subpart 2C, either a permit or written <br />waiver from that agency for that construction or reconstruction to be <br />performed under the construction contract. The City is advised that <br />pursuant to Minnesota Rules 7001.1040, a written application for the <br />permit or waiver must be submitted to the Minnesota Pollution Control <br />Agency at least 180 days before the planned date of the sanitary <br />sewer facility construction or reconstruction. <br /> <br />~RTICLE .II -_BASIS OF PAYMENT BY T~E STATE <br /> <br />i <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />SDction A,. SCHEDULE "I". <br /> <br />A Preliminary SCHEDULE "I" is attached hereto and made a part hereof <br />by reference. The Preliminary SCHEDULE "I" includes all anticipated. <br />State cost participation construction items and funding limits <br />covered under this Agreement. <br /> <br />Section B. State Cost Participation Construction <br />The State's cost'participation in the roadway and storm sewer <br />construction which is to be performed upon, along and'adjacent to <br />Trunk Highway No. 47 from 130 meters' north of County State Aid <br />Highway No. 116 to 350 meters north'of 153rd Avenue Northwest within <br />the corporate City limits under State Project No. 0206-50 <br />(T.H. 47=i10), includes the State's'proportionate share of item ~osts <br />for mobilization, field office, field laboratory and traffic control. <br /> <br />Section C .... Liquidated Damages <br /> <br />Ail liquidated damages assessed the City's contractor in connection <br />with the construction contract shall result in a credit shared by the <br /> <br />6 <br /> <br />377 <br /> <br /> <br />