My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 04/25/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:42:28 PM
Creation date
9/8/2003 10:33:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />! <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />79692 <br /> <br />WHEREAS the frontage road and trunk highway access construction and <br />other associated construction was performed upon, along and adjacent <br />to and on the north side of Trunk Highway No. 10 west of County Road <br />No. 56 along with the removal of the temporary access to Trunk <br />Highway No. 10, within the corporate City limits in accordance with <br />City-prepared plans, specifications and/or special provisions <br />designated as State Project No. 0202-77 (T.H. 10=003); and <br /> <br />WHEREAS the State is willing to participate in the costs of the <br />frontage road and access construction and associated construCtion <br />engineering in a lump sum amount as hereinafter set forth; and <br /> <br />WHEREAS Minnesota Statutes Section 161.2'0, subdivision 2 authorizes <br />the Commissioner of Transportation to make arrangements with and <br />cooperate with any governmental authority for the purposes, of <br />constructing, maintaining and improving the trunk highway system. <br /> <br />IT IS, THEREFORE, MUTUALLY AGREED AS FOLLOWS: <br /> <br />ARTICLE I - CONSTRUCTION .BY THE CITY <br /> <br />The City has performed the contract construction in accordance with <br />State-approved City plans, specifications and/or special provisions <br />designated as State Project No. 0202--77 (T.'H. 10=00'3)', which are on <br />file in the office of the City's Engineer, and are made a part hereof <br />by reference with the same force and effect as though fully set forth <br />herein. <br /> <br />ARTICLE II - PAYMENT BY THE STATE <br /> <br />The State shall advance to the City, as the State's full and complete' <br />share of the costs of the frontage road and access construction and <br />associated construction engineering performed upon, along and <br />adjacent to Trunk Highway No. 10 west of County Road No. 56 within <br />the corporate City limits under State Project No. 0202-77 <br /> <br /> (T.H. 10=003), a lump sum in the amount of $37,537.24. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.