My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 05/23/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:43:34 PM
Creation date
9/8/2003 10:58:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation of B-6/12 continuous concrete curbing around the perimeter of all <br />bituminous surfaces. <br />Establishment of turf in areas disturbed during construction. <br />Landscaping in accordance with the Site and Landscape Plan prepared by Larnpert <br />Architects, dated February 14, 2000, revision dated February 24, 2000. <br /> <br />("Required Improvements) <br /> <br />SATISFACTION OF SEWER AND WATER TRUNK CHARGES. The Permittee <br />agrees to pay the standard per acre sanitary sewer and water trunk charges on the entire <br />area of the Site. The current standard charge is Two Thousand Eight Hundred and Eighty <br />Nine Dollars ($2,889.00) per acre for sewer and Six Thousand Four Hundred and Thirty <br />Five Dollars ($6,435.00) per acre for water. The total acreage of the land for which the <br />trunk charges are to be collected is 8.94 acres. In addition, since the existing trunk sewer <br />also provides a lateral service to the site a lateral benefit charge of $6,633 for water and <br />$2,980 for sanitary sewer are also required. This results in a total payment of Ninety Two <br />Thousand Nine Hundred Sixty Nine Dollars and no cents ($92,969.00) to satisfy these <br />trunk charges. <br /> <br />STORMWATER MANAGEMENT FEE. The CITY has enacted a Stormwater <br />Management Fee in the amount of Three Thousand Six Hundred Fifty Eight Dollars <br />($3,658.00) per commercial acre. The mount of Stormwater Management Fee due on <br />the Site is TMrty Two Thousand Seven Hundred Three Dollars ($32,703.00) (8.94 acres x <br />$3658/acre). A cash payment will be required prior to the CITY releasing the Building <br />Permit. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Chief. <br /> <br />LIGHTING. Any lighting installed on the structure or in the parking lot is subject to the <br />prior approval of the City Engineer. Bulbs emitting in excess of 3,000 lumens (150 <br />watts) shall be so directed that the bulb is not visible from off of the property where such <br />light source is located <br /> <br />10. <br /> <br />BUILDING FACADE. The Permittee agrees to face the Structure with a combination of <br />smooth and rock face block with a pre-finished metal wrapped column and canopy in <br />accordance with the Exterior Elevations prepared by Lampert Architects dated February <br />28, 2000. <br /> <br />11. <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for the Site will be issued until the permittee has: a) <br />signed and returned this Development Permit; b) provided the required cash payment for <br />tnmk sewer and water services in accordance with Item #6 of this Permit; c) provided the <br />required cash payment for stormwater management in accordance with Item #7 of this <br />Permit; and d) provided the required financial guarantee in accordance with Item 14 of <br />this Permit. No Certificate of Occupancy for the structure will be issued until the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.