My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 05/23/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:43:34 PM
Creation date
9/8/2003 10:58:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW CASE # <br /> <br />UPDATE ON WATER TOWER NO. 2 <br /> By Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />On Monday May 15, 2000, staff will be meeting with AEC Engineering to review the Project <br />Procedures Manual which is the first deliverable document under our contract with this firm for <br />the design and specifications for water tower No 2. We anticipate bringing the plan and <br />specifications to the City Council for bidding on May 23, 2000, and an award date of June 27, <br />2000. A review of direction given to the consultant earlier in the year was as follows: <br /> <br />1) <br /> <br />2) <br />3) <br /> <br />Bids should allow for a water spheroid (the style of the existing Ramsey tower) and the <br />hydropillar style (the style used by Champlin). <br />A three-color painting scheme might be anticipated. <br />Bids should be received for two completion dates: Late Fall 2001 and early Summer <br />2001. The Council can then evaluate the cost of completion in order to have the tank <br />serviceable to meet the demands of Summer 2001. <br /> <br />If as a result of the Monday review with AEC, there are any decisions necessary to finalize the <br />plans and specifications, City staffwould present those issues to the committee. <br /> <br />Committee Action: <br /> <br />Based on outcome of AEC Project Procedures Manual review. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />Director of Public Works <br />Parks/Utilities Supervisor <br /> <br />PW: 05/16/00 <br /> <br />G:lusers~City Shared FilelPWCommilted2OOO~tay~update water tower#2.doc 05/12/00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.