Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CiTY OF RAMSEY <br />2000 SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted December 14, 1999oAmended June 27, 2000 <br /> <br /> 2000 <br />SERVICE OR LICENSE SPECIAL NOTES Adopted <br />"' ~ileage/personal vehicle (IRS allowable rate) 0.31/mile: <br />~ Developer contribution: <br />~ 'street and/or traffic ~ign; lS0.O0/siga <br /> future sealcoating .75/sq yard <br /> Culvefls. 7,38 per foot + 6,5% tax <br /> Stre? Sweeping: <br /> General Maintenagce Charge.- Di~ Roads <br /> UTILI;FY RATES <br /> IResiential Curb-s/dc Program fec/qtr 5.34 <br /> Residen.tial usage fee/qtr 56.93 <br /> Multi-~mily & commercial usage'fee/qtr 56.93+2.54/1000 gal. <br /> in excess Of 20,000 gal. <br /> Conoection charge/res, eqpiva.lent inc. by cu~ent cons~ction index 537.00 <br /> Connection charge/acre residential inc. by cu~ept constn~c[ion in~ex 1,6 [3,00 <br /> Connection charge/acre comm./ind, inc. by cu~ent cons~uction index 2,889.00 <br /> Lateral Benefit Charges inc. by cu~ent construction index 2,980.00 <br /> ~Developer contribution: <br /> installation of Cobra street light 700.00/light <br /> traditionaire subdivisioa street light (w/tOO Ro~wire) 500.00/light <br /> street light O & M 3 year ~ $90/year .300.00/light <br /> Residential billing: <br /> urbao subdivision street light rate per lot (>7/92) 8.50/quarter <br /> rural subdivision s~reet light rate per lot 14.00/qua~er <br /> priority street light rate per residential lot 1.20/qua~er <br /> '<'""'"": '"-'"":""' ' ~"""k'""-'¢"'"'"'"-'"': =========================================================================== <br /> Residential 6.30/qua~er <br /> Commercial Based Upon Engineers Calculations $25.20/~U <br /> Trunk charge/res, equivalent 'inc. by cu~ent cons~ction index 366.00 <br /> l'runk charge/~cre comm./ind, inc. by cu~ent construction index 3,658.00 <br /> IUsage fee per lk gallons 1.39 <br /> Minimum usage fee/qtr 20.85 <br /> installation of meter w/remote 100.00 <br /> J3/8" Meter with hum 135.00 <br /> Replacement Meter Hum 30.00 <br /> Other than 5/8" or 2" meter Cost plus 15% <br /> Reconnect t~e 75.00 <br /> Water Use Permit 50+$20~r staff time <br /> Pe~it usc per lk g~ll~ns 10.00 <br /> Connection charge/re~, equivalent mc. by cu~ent cons~ucbon index i, ~97.00 <br /> Connection ch~rge/~cre residential inc. by cu~ent cons~ction index 3,511.00 <br /> Connection charge/acre comm./ind. . . inc. by cu~ent construction index 6,435,00 <br /> Lateral Benefit Charges inc. by cunent cons~uction index 6,633.00 <br /> <br />5 <br /> <br /> <br />