My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 06/27/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:44:28 PM
Creation date
9/8/2003 11:19:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />Tree wood removed during construction, road building and sewer/water <br />installation shall be buried, burned, chipped or hauled to a licensed wood <br />disposal site. <br /> <br />Whole trees may not be disposed of by burning. Trunks and limbs larger <br />than six (6) inches in diameter must be salvaged for lumber, firewood, <br />chipped or hauled to a licensed wood disposal site. Application may be <br />made for an open burning permit to dispose of brush less than six (6) <br />inches in diameter and stumps with less than four feet of main trunks <br />attached. The location of the proposed open burn site will be specified by <br />the City Engineer, Environmental Specialist and Fire Chief. Wood <br />disposal by burning requires whole tree volume reduction, proposed site <br />inspection prior to clearing and an open burning permit. Residual ash and <br />unburned stumpage may be buried on the site at the direction of the City <br />Engineer. Chipped material may be applied and utilized on site to mitigate <br />root damage from grade changes of the easement or right-of-way and for <br />erosion control and top soil restoration. <br /> <br />Dumping of Garbage. The DEVELOPER shall adhere to all City ordinances <br />relating to, but not limited to, dumping of garbage, site development, construction <br />debris, open burning, etc. <br /> <br />Estimated Costs. It is understood and agreed that construction cost amounts set <br />forth in this Agreement as Stage I and Stage II Improvements, unless specified as <br />fixed amounts, are estimated. The DEVELOPER agrees to pay the entire cost of <br />said improvements including interest, fiscal engineering and legal charges. <br /> <br />Plat Expense Reimbursement. The DEVELOPER agrees that it will pay to the <br />CITY all CITY expenses incurred in approval of the Plat, including, but not <br />limited to administration expenses, engineering and legal fees. Said expenses <br />shall be paid within fifteen (15) days of billing by the CITY and outstanding <br />billings shall be paid prior to recording of the Final Plat. Any expenses incurred <br />after recording of the Final Plat shall also be paid within said fifteen (15) days <br />billing period. Failure to pay the CITY'S expenses with the fifteen (15) day <br />billing period will permit the CITY to draw upon any of the escrows required by <br />this contract for payment. <br /> <br />Reimbursement to Ci _ty. The DEVELOPER agrees to reimburse the CITY for <br />all costs incurred by the CITY in defense or enforcement of this Agreement, or <br />any portion thereof, including court costs and reasonable engineering and <br />attorney's fees. <br /> <br />Notification. The DEVELOPER agrees to notify the CITY of all sales of lots <br />within the Plat. <br /> <br />84 <br /> <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.