Laserfiche WebLink
STATEMENT OF WORK CERTIFIED <br /> <br /> STATE OF MINNESOTA - DEPARTMENT OF TRA2NSPORTATION <br /> I MAIN BODY ITEMS (Group Level Detail) <br /> <br /> n Contract Unit Contract Contract To Date To Date Grp Line <br /> <br />509 TYPE LV 3 NON WEARING COURSE MIXTURE T 27.25 14,327.00 390,410.75 0.00 0.00 001 0470 <br /> <br />I TYPE LV 3 NON WEARING COURSE MIXTURE T 27.25 1,590.00 43,327.50 0.00 0.00 003 0470 <br />TYPE LV 3 NON WEARING COURSE MIXTURE T 27.25 653,00 17,794.25 0.00 0.00 005 0470 <br />609 TYPE LV 3 NON WEARING COURSE MIXTURE T 27.25 75.00 2,043.75 0.00 0.00 007 0470 <br /> <br /> Totals for Proposal Line Number 0470 16,645.00 $453,576.25 0.00 $0.00 <br /> <br />:2 BI/73MINOUS MATERIAL FOR TACK COAT L 0.30 25,427.00 7,628.10 1,268.00 380.40 001 0480 <br />502 BITUMINOUS MATERIAL FOR TACK COAT L 0.30 3,232.00 969.60 0.00 0.00 003 0480 <br />2 BITUMINOUS MATERIAL FOR TACK COAT L 0.30 1,195.00 358.50 0.00 0.00 005 0480 <br />2 BITI/MINOUS MATERIAL FOR TACK COAT L 0.30 141.00 42.30 0.00 0.00 007 0480 <br />Totals for Proposal Line Number 0480 29,995.00 $8,998.50 1,268.00 $380.40 <br /> <br /> 4 MOD~ BLOCK RETAINING WALL M2 150.00 335.00 50,250.00 0.00 0.00 001 0490 <br /> Totals for Proposal Line Number 0490 335.00 $50,250.00 0.00 $0.00 <br /> <br /> 109 AGGREGATE FO[/NDATION T 15.17 1,025.00 15,549.25 0.00 0.00 002 0500 <br /> Totals for Proposal Line Number 0500 1,025.00 $15,549.25 0.00 $0.00 <br /> <br />515 375 ~ RC PIPE APRON EACH 310.78 11.00 3,418.58 0.00 0.00 002 0510 <br /> Totals for Proposal Line Number 0510 11.00 $3,418.58 0.00 $0.00 <br /> <br /> 515 450 MM RC PIPE APRON EACH <br />515 450 MM RC PIPE APRON EACH <br /> <br /> Totals for Proposal Line Number 0520 <br /> <br />334.68 1.00 334.68 0.00 0.00 002 0520 <br /> <br />334.68 1.00 334.68 0.00 0.00 006 0520 <br /> 2.00 $669.36 0.00 $0.00 <br /> <br />.,.515 600 MM RC PIPE APRON EACH <br /> Totals for Proposal Line Number 0530 <br /> <br />343.51 <br /> <br />1.00 343.51 0.00 0.00 006 0530 <br />1.00 $343.51 0.00 $0.00 <br /> <br />~1.515 675 MM RC PIPE APRON EACH <br /> <br /> Totals for Proposal Line Number 0540 <br /> <br />444.03 <br /> <br />1.00 444.03 0.00 0.00 006 0540 <br />1.00 $444.03 0.00 $0.00 <br /> <br /> .515 900 MM RC PIPE APRON EACH 720.66 2.00 1,441.32 0.00 0.00 002 0550 <br /> <br /> Totals for Proposal Line Number 0550 2.00 $1,441.32 0.00 $0.00 <br /> <br />501.561 375 MM RC PIPE CULVERT DES 3006 M <br /> 11~561 375 MM RC PIPE CULVERT DES 3006 M <br /> Totals for Proposal Line Number 0560 <br /> <br />71.15 25.60 1,821.44 0.00 0.00 002 0560 <br /> <br />71.15 35.90 2,554.28 0.00 0.00 004 0560 <br /> 61.50 $4,375.72 0.00 $0.00 <br /> <br />375 MM RC PIPE CULVERT DES 3006 CL M <br /> Totals for Proposal Line Number 0570 <br /> <br />71.15 <br /> <br />26.70 1,899.70 0.00 0.00 002 0570 <br />26.70 $1,899.70 0.00 $0.00 <br /> <br />i h' <br /> S.P.I~3MRER 199-010-03 <br /> <br />FOR WORK COMPLETED AS OF 06/20/2000 <br /> <br />Contract Number: Z00516 <br /> <br /> <br />